Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 136
Message text: Release is only possible within this period
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CK136
- Release is only possible within this period ?The SAP error message CK136 "Release is only possible within this period" typically occurs in the context of controlling and cost management, particularly when dealing with cost estimates or product costing. This error indicates that the system is preventing the release of a cost estimate or a similar transaction because the release date falls outside of the allowed period defined in the system settings.
Cause:
- Period Control Settings: The error is often caused by the period control settings in the controlling (CO) module. Each company code has specific settings that define the periods during which cost estimates can be released.
- Closed Periods: The period you are trying to release the cost estimate into may be closed for posting. This can happen if the financial period has been closed in the system.
- Authorization Issues: Sometimes, the user may not have the necessary authorizations to release cost estimates in the specified period.
Solution:
Check Period Settings: Verify the period control settings in the controlling module. You can do this by navigating to the configuration settings in SAP:
- Go to SPRO ? Controlling ? Cost Element Accounting ? Master Data ? Maintain Period Control.
- Ensure that the period you are trying to release is open for posting.
Open the Period: If the period is closed, you may need to open it. This typically requires authorization and should be done in accordance with your organization's policies. You can open the period using transaction code OB52.
Check User Authorizations: Ensure that the user attempting to release the cost estimate has the necessary authorizations. This can be checked with your SAP security team.
Consult with Finance Team: If you are unsure about opening a period or changing settings, consult with your finance or controlling team to ensure compliance with accounting practices.
Use Transaction CK40N: If you are trying to release a cost estimate, you can use transaction CK40N to check the status of the cost estimate and see if there are any issues that need to be resolved.
Related Information:
By following these steps, you should be able to resolve the CK136 error and successfully release the cost estimate or transaction in question.
Get instant SAP help. Start your 7-day free trial now.
CK135
Period is in the past
What causes this issue? Since the planning period has changed, you can no longer mark or release costing results for this costing run using the costi...
CK134
Marking and release not possible
What causes this issue? The organizational measure 'Allow marking' does not allow marking and release of this cost estimate (costing varian...
CK137
Plant &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK138
Marking for posting period & & not allowed
What causes this issue? You are attempting to carry out <DS:GLOS.marking>marking</> for period &V1& &V2&, but marking has...
Click on this link to search all SAP messages.