Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 584
Message text: No valid scheduling type has been entered. Edit settings
Activity &V1& is not a general costs activity. You cannot create
general cost elements for the activity.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
Error message extract from SAP system. Copyright SAP SE.
CJ584
- No valid scheduling type has been entered. Edit settings ?The SAP error message CJ584: No valid scheduling type has been entered. Edit settings? typically occurs in the context of project management within SAP, particularly when dealing with project definitions or network activities. This error indicates that the system requires a scheduling type to be defined, but none has been provided.
Cause:
- Missing Scheduling Type: The most common cause of this error is that the scheduling type field is either blank or has not been set up correctly in the project definition or network activity.
- Configuration Issues: There may be issues with the configuration settings in the project management module that prevent the scheduling type from being recognized.
- User Input Error: The user may have inadvertently skipped entering the scheduling type when creating or modifying a project or network.
Solution:
To resolve the CJ584 error, follow these steps:
Check Project Definition/Network Activity:
- Navigate to the project definition or network activity where the error occurred.
- Ensure that the scheduling type field is filled in correctly. This field is usually found in the project or network settings.
Edit Scheduling Type:
- If the scheduling type is missing, enter a valid scheduling type. Common scheduling types include:
- As Soon As Possible (ASAP)
- As Late As Possible (ALAP)
- Fixed Date
- Save the changes.
Review Configuration Settings:
- If the scheduling type is correctly entered but the error persists, check the configuration settings in the SAP system.
- Go to the configuration transaction (SPRO) and navigate to:
- Project System > Structures > Work Breakdown Structure > Define Project Definition
- Ensure that the settings for scheduling types are correctly configured.
Consult Documentation:
- If you are unsure about which scheduling type to use, refer to the SAP documentation or consult with your project management team for guidance.
User Authorization:
- Ensure that you have the necessary authorizations to edit project definitions or network activities. Lack of permissions can sometimes lead to unexpected errors.
Related Information:
By following these steps, you should be able to resolve the CJ584 error and successfully define the scheduling type for your project or network activity.
Get instant SAP help. Start your 7-day free trial now.
CJ583
The subordinate WBS elements of WBS elem. & are not all finally confirmed
What causes this issue? Activity &V1& is not an external activity. You cannot create a general costs element for this activity.System Respons...
CJ582
Not all activities assigned to WBS element & have been finally confirmed
What causes this issue? The finish date of the WBS element can only be confirmed, if all the subordinate objects (WBS elements, activities) have been...
CJ585
No graphic profile with group &, name & and index &
What causes this issue? You are attempting to shift a block of time for a WBS element in a Gantt chart. The dates for the WBS element will be copied ...
CJ586
Time profile & does not exist
What causes this issue? In a Gantt chart, you can only delete WBS elements.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID...
Click on this link to search all SAP messages.