Message text: Network & locked. Time scheduling not possible
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CJ511
- Network & locked. Time scheduling not possible ?The SAP error message CJ511 ("Network & locked. Time scheduling not possible") typically occurs in the context of project management within SAP, particularly when dealing with networks in Project System (PS). This error indicates that the network you are trying to schedule is currently locked, which prevents any time scheduling operations from being performed.
Causes:
- Network Lock: The network is locked by another user or process. This can happen if someone is currently editing the network or if a transaction that involves the network is still open.
- Incomplete Data: The network may have incomplete or inconsistent data that prevents scheduling.
- Authorization Issues: The user may not have the necessary authorizations to perform scheduling on the network.
- System Lock: Sometimes, system-level locks can occur due to background jobs or other processes that are running.
Solutions:
Check for Locks:
- Use transaction code SM12 to check for any locks on the network. You can filter by the user or the object type to find relevant locks.
- If you find a lock that is no longer needed, you can delete it (if you have the necessary authorizations).
Wait for Release:
- If the lock is due to another user, you may need to wait until they finish their work and release the lock.
Check Network Status:
- Ensure that the network is in a valid status for scheduling. You can check the status in transaction CJ20N or CJ02.
Review Authorizations:
- Ensure that you have the necessary authorizations to perform scheduling on the network. You may need to contact your SAP security team if you suspect authorization issues.
Check for Incomplete Data:
- Review the network for any missing or inconsistent data that may prevent scheduling. Ensure that all required fields are filled out correctly.
System Administration:
- If the issue persists, it may require intervention from your SAP Basis team to check for any system-level locks or issues.
Related Information:
If the problem continues after trying the above solutions, it may be beneficial to consult with your SAP support team or refer to SAP's support portal for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CJ510
Network & locked. You cannot shift dates
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ509
Enter a standard network or network
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ512
Actual finish date for WBS element & cannot be maintained
What causes this issue? You cannot enter any actual finish dates for WBS element &V1& if the subordinate WBS element does not have an actual ...
CJ513
No dates exist for WBS element &
What causes this issue? You have entered an object in WBS scheduling that does not have a start or finish date.System Response INCLUDE 'NA_ALLG...
Click on this link to search all SAP messages.