Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 189
Message text: No capacities have been assigned to the selected WBS elements
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CJ189
- No capacities have been assigned to the selected WBS elements ?The SAP error message CJ189 ("No capacities have been assigned to the selected WBS elements") typically occurs in the context of project management when you are trying to perform capacity planning or scheduling for a Work Breakdown Structure (WBS) element, but there are no capacities assigned to that WBS element.
Cause:
- No Capacity Assignment: The most common cause is that the WBS element does not have any capacity assigned to it. This can happen if the project has not been properly set up or if the necessary resources have not been allocated.
- Incorrect Configuration: The configuration settings for the project or the WBS element may not be set up correctly, leading to the absence of capacity assignments.
- Resource Availability: The resources that are supposed to be assigned to the WBS element may not be available or may not have been defined in the system.
- Project Status: The project or WBS element may be in a status that does not allow for capacity assignments.
Solution:
Assign Capacities:
- Go to the relevant WBS element in the project structure.
- Navigate to the capacity planning or resource assignment section.
- Assign the necessary capacities (resources) to the WBS element.
Check Resource Availability:
- Ensure that the resources you want to assign are available and properly defined in the system.
- Check if the resources are assigned to the correct project or WBS element.
Review Project Configuration:
- Verify the configuration settings for the project and WBS elements to ensure they are set up correctly.
- Make sure that the project is in a status that allows for capacity assignments.
Use Transaction Codes:
- You can use transaction codes like CJ20N (Project Builder) to manage and assign resources to WBS elements.
- Use transaction code CJR2 (Change Project) to check and modify the project structure.
Consult Documentation:
- Review SAP documentation or help files related to project management and capacity planning for additional guidance.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP Notes for any specific patches or updates related to this error message.
Get instant SAP help. Sign up for our Free Essentials Plan.
CJ188
Control error & has occured in the graphic
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ187
Planning board profile cannot be changed
What causes this issue? You cannot change the current profile for the project planning board . One of the two indicators "No changes" or &...
CJ190
Activity elements are not copied separately
What causes this issue? Activity elements cannot be copied without the corresponding activities.System Response INCLUDE 'NA_ALLG_NOFUNKTION...
CJ191
Activity & Network &: Release not allowed
What causes this issue? You want to release activity &V1& order &V2&. The business transaction <ls>Release</> however is ...