Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 091
Message text: Activity &1 in standard network &2 is asigned to the WBS element
The WBS element cannot be deleted, because it has been assigned network
activities from standard networks.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
First delete the existing assignments, then you can delete the WBS
element.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message CJ091 indicates that there is an issue with the assignment of an activity to a Work Breakdown Structure (WBS) element in a standard network. Specifically, the error message states that the activity is already assigned to a WBS element, which can lead to conflicts or inconsistencies in project management.
Cause:
- Duplicate Assignment: The activity you are trying to assign to a WBS element is already linked to another WBS element or network.
- Incorrect Configuration: There may be configuration settings in the project system that prevent the assignment of activities to multiple WBS elements.
- Data Integrity Issues: There could be issues with the data integrity in the project structure, leading to conflicts in assignments.
Solution:
- Check Existing Assignments: Verify if the activity is already assigned to another WBS element. You can do this by navigating to the activity in the network and checking its current assignments.
- Reassign the Activity: If the activity is indeed assigned to another WBS element and you want to change it, you will need to remove the existing assignment before assigning it to the new WBS element.
- Use the Correct Transaction: Ensure you are using the correct transaction codes (like CJ20N for project management) to manage your project structures and assignments.
- Consult Documentation: Review SAP documentation or help files for specific instructions on managing activities and WBS elements in your version of SAP.
- Check Authorizations: Ensure that you have the necessary authorizations to make changes to the project structure and assignments.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project systems.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP error explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |
CJ090 Standard network & is assigned to the WBS element
What causes this issue? The WBS element cannot be deleted, because it has been ...
CJ089 Start date must be earlier than &
What causes this issue? You have entered a date that does not lie within the pl...
CJ092 WBS element &: Assignments of dependent objects
Self-Explanatory Message Since SAP believes that this specific error message is ...
CJ093 Project &: Assignments of dependent objects
Self-Explanatory Message Since SAP believes that this specific error message is ...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.