Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 090
Message text: Standard network & is assigned to the WBS element
The WBS element cannot be deleted, because it has been assigned network
headers from standard networks.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
First delete the existing assignments, then you can delete the WBS
element.
Error message extract from SAP system. Copyright SAP SE.
CJ090
- Standard network & is assigned to the WBS element ?The SAP error message CJ090 indicates that a standard network is assigned to a Work Breakdown Structure (WBS) element, but there is an issue with the assignment. This error typically arises in the context of project management within SAP, particularly when dealing with project structures and networks.
Cause of Error CJ090
- Incorrect Assignment: The standard network may not be correctly assigned to the WBS element. This can happen if the network is not properly linked or if there are inconsistencies in the project structure.
- Network Status: The status of the network might not allow it to be assigned to the WBS element. For example, if the network is in a status that does not permit assignment (like "deleted" or "not released"), this error can occur.
- Missing Authorizations: The user may not have the necessary authorizations to perform the assignment.
- Configuration Issues: There may be configuration settings in the project system that prevent the assignment of networks to WBS elements.
Solution to Error CJ090
- Check Network Assignment: Verify that the standard network is correctly assigned to the WBS element. You can do this by navigating to the network and checking its assignment details.
- Review Network Status: Ensure that the network is in a status that allows it to be assigned. If necessary, change the status of the network to a valid one (e.g., "Released").
- Authorization Check: Ensure that the user has the necessary authorizations to assign networks to WBS elements. This may involve checking user roles and permissions in the SAP system.
- Configuration Review: If the issue persists, review the configuration settings in the project system to ensure that there are no restrictions on assigning networks to WBS elements.
- Consult Documentation: Refer to SAP documentation or help resources for additional guidance on the specific project management settings and configurations.
Related Information
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who specializes in SAP Project System (PS) for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CJ089
Start date must be earlier than &
What causes this issue? You have entered a date that does not lie within the planned range for scheduling.System Response The system issues an error...
CJ088
Final date must be later than &
What causes this issue? You have entered a date that does not lie within the planned range for scheduling.System Response The system issues an error...
CJ091
Activity &1 in standard network &2 is asigned to the WBS element
What causes this issue? The WBS element cannot be deleted, because it has been assigned network activities from standard networks.System Response Th...
CJ092
WBS element &: Assignments of dependent objects
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.