Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 087
Message text: Error during scheduling. Save function not possible
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message CJ087 ("Error during scheduling. Save function not possible") typically occurs in the context of project management within SAP, particularly when dealing with project structures, networks, or activities. This error indicates that there is an issue with the scheduling of a project or activity, which prevents the system from saving the changes.
Causes:
- Missing or Incorrect Data: Required fields for scheduling may be missing or incorrectly filled out. This can include dates, durations, or dependencies.
- Conflicting Dates: The start and finish dates of activities may conflict with each other or with the overall project timeline.
- Resource Allocation Issues: Resources may not be properly allocated, or there may be conflicts in resource availability.
- Network Logic Errors: There may be issues with the network logic, such as circular dependencies or missing predecessor/successor relationships.
- System Configuration: There may be configuration issues in the project management settings that prevent proper scheduling.
Solutions:
- Check Data Completeness: Ensure that all required fields are filled out correctly. Verify that all necessary data for scheduling is present.
- Review Dates: Check the start and finish dates of all activities to ensure they are logical and do not conflict with each other.
- Validate Resource Allocation: Ensure that resources are correctly assigned and that there are no conflicts in resource availability.
- Examine Network Logic: Review the network diagram for any logical errors, such as circular dependencies or missing links between activities.
- Use Scheduling Tools: Utilize SAP's scheduling tools to analyze and resolve scheduling conflicts. The "Schedule" function can help identify issues.
- Check for System Messages: Look for any additional error messages or warnings that may provide more context about the issue.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to project scheduling errors.
Related Information:
If the problem persists after checking these areas, it may be beneficial to consult with your SAP support team or a technical consultant who can provide deeper insights into the specific configuration and data setup in your SAP environment.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP error explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |
CJ086 Milestone &1 is assigned to another WBS element
What causes this issue? This milestone has already been assigned to another WBS...
CJ085 Create an object by double-clicking or drag and drop
Self-Explanatory Message Since SAP believes that this specific error message is ...
CJ088 Final date must be later than &
What causes this issue? You have entered a date that does not lie within the pl...
CJ089 Start date must be earlier than &
What causes this issue? You have entered a date that does not lie within the pl...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.