Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CI_DRAFTPRD_MESSAGE -
Message number: 054
Message text: Lot size (products planning) & is not defined
The value you have entered is not defined in the system.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check your entry and choose another value from the possible entries.
If you want your original value to be defined in the system, contact
your system administrator.
Error message extract from SAP system. Copyright SAP SE.
CI_DRAFTPRD_MESSAGE054
- Lot size (products planning) & is not defined ?The SAP error message CI_DRAFTPRD_MESSAGE054 typically indicates that there is an issue with the lot size configuration for a product in the planning process. This error can occur in various scenarios, such as during production planning, material requirements planning (MRP), or when creating a production order.
Cause:
- Lot Size Not Defined: The primary cause of this error is that the lot size for the specified product is not defined in the material master data. Lot size is crucial for planning as it determines the minimum quantity that can be produced or ordered.
- Missing Configuration: The lot size settings may not be configured correctly in the material master or in the relevant planning parameters.
- Incorrect Planning Parameters: The planning parameters for the product may not be set up correctly, leading to the system not being able to determine the appropriate lot size.
- Product Not Active: The product may not be active in the system for planning purposes.
Solution:
Check Material Master Data:
- Go to the material master record (transaction code
MM03
).- Check the "MRP" view and ensure that the lot size is defined. You may need to set a standard lot size or a specific lot size type (e.g., fixed lot size, lot-for-lot).
Define Lot Size:
- If the lot size is not defined, you can define it by editing the material master data. You can set the lot size in the MRP view under the "Lot Size" field.
Review Planning Parameters:
- Check the planning parameters in the material master and ensure they are set correctly. This includes reviewing the MRP type, lot size type, and any other relevant settings.
Activate Product:
- Ensure that the product is active for planning. If the product is not active, you may need to activate it in the relevant configuration settings.
Consult Documentation:
- If you are unsure about the correct settings, consult the SAP documentation or your organization's SAP support team for guidance on how to configure lot sizes properly.
Related Information:
MM03
- Display Material MasterMM02
- Change Material MasterMD04
- Stock/Requirements ListBy following these steps, you should be able to resolve the CI_DRAFTPRD_MESSAGE054 error and ensure that the lot size for the product is correctly defined in SAP.
Get instant SAP help. Sign up for our Free Essentials Plan.
CI_DRAFTPRD_MESSAGE053
In-house production time is 0 for product produced in-house
What causes this issue? You are creating a master record for a product that is to be produced in-house. However, you have not entered an in-house pro...
CI_DRAFTPRD_MESSAGE052
Planned delivery time is 0 for externally procured product
What causes this issue? You are creating a master record for a product that is to be procured externally. However, you have not entered a planned del...
CI_DRAFTPRD_MESSAGE055
You have not assigned an MRP group to the product
What causes this issue? You have not entered an MRP group in the product master record. The system issues an error message and will not allow you to ...
CI_DRAFTPRD_MESSAGE056
No active screen (e.g. product not maintained here)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.