Do you have any question about this error?
Message type: E = Error
Message class: CI_DRAFTPRD_MESSAGE -
Message number: 045
Message text: The unit of issue cannot be changed because product is used in a BOM
The unit of issue cannot be changed because the product is used in a BOM
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
The unit of issue can be changed only in the following cases:
If there is no change in the dimension of the unit of issue, and if the
unit of issue is not dimensionless
If the base unit of measure and the previous unit of issue have the same
dimension, and are not dimensionless
Error message extract from SAP system. Copyright SAP SE.
CI_DRAFTPRD_MESSAGE045
- The unit of issue cannot be changed because product is used in a BOM ?The SAP error message CI_DRAFTPRD_MESSAGE045 indicates that you are trying to change the unit of issue for a product that is currently being used in a Bill of Materials (BOM). This restriction is in place because changing the unit of issue could affect the integrity of the BOM and the associated production processes.
Cause:
- BOM Dependency: The product is part of a BOM, and changing the unit of issue could lead to inconsistencies in how the components are managed and consumed in production.
- Data Integrity: SAP enforces this restriction to maintain data integrity and ensure that all references to the product in the BOM remain valid.
Solution:
To resolve this error, you have a few options:
Remove the Product from the BOM:
- If you need to change the unit of issue, you can temporarily remove the product from the BOM. After making the change, you can add it back to the BOM.
- Steps:
- Go to the BOM transaction (e.g., CS02 for changing BOM).
- Locate the BOM that includes the product.
- Remove the product from the BOM.
- Save the changes.
- Change the unit of issue for the product.
- Re-add the product to the BOM.
Change the Unit of Issue in a Non-BOM Context:
- If the product is used in multiple BOMs, consider whether you can change the unit of issue in a different context or for a different product variant that is not currently in use.
Consult with Stakeholders:
- Before making changes, consult with relevant stakeholders (e.g., production, planning, and engineering teams) to understand the implications of changing the unit of issue and to ensure that it aligns with business processes.
Use a Different Product:
- If changing the unit of issue is critical and cannot be done while the product is in the BOM, consider creating a new product with the desired unit of issue and updating the BOM to use this new product.
Related Information:
By following these steps, you should be able to resolve the error and make the necessary changes to the unit of issue for the product.
Get instant SAP help. Start your 7-day free trial now.
CI_DRAFTPRD_MESSAGE044
Product & does not exist in stage location & of plant &
What causes this issue? No product master data exists for product in storage location of plant . The system issues an error message and will not allo...
CI_DRAFTPRD_MESSAGE043
Unit of issue cannot be changed (Product used as prod. resource/tool)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CI_DRAFTPRD_MESSAGE046
Product & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CI_DRAFTPRD_MESSAGE047
The product must be managed in batches; enter a batch number.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.