Do you have any question about this error?
Message type: E = Error
Message class: CI - Plant maintenance task list messages
Message number: 250
Message text: Operation &: Product of work x execution factor is too large
The product <ZH>work x execution factor</> exceeds the work display
format. This product is determined during order processing and would
cause the program there to terminate.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
You can proceed as follows:
Increase the unit of time for work (for example, days instead of
hours).
Reduce the work
Reduce the execution factor
Reduce the task list factor
Error message extract from SAP system. Copyright SAP SE.
CI250
- Operation &: Product of work x execution factor is too large ?The SAP error message CI250, which states "Operation &: Product of work x execution factor is too large," typically occurs in the context of production planning or work center operations. This error indicates that the calculated value for the work required for a particular operation exceeds the maximum allowable limit defined in the system.
Cause:
- Excessive Work Calculation: The error arises when the product of the work (in hours or other units) and the execution factor (which may represent the number of units or some other multiplier) results in a value that exceeds the system's predefined limits.
- Configuration Issues: There may be incorrect settings in the work center or routing that lead to unrealistic calculations.
- Data Entry Errors: Incorrect data entries in the production order, such as incorrect quantities or execution factors, can lead to this error.
- System Limits: SAP has certain limits for numerical values, and if the calculated work exceeds these limits, the error will be triggered.
Solution:
- Review Work Center Configuration: Check the configuration of the work center involved in the operation. Ensure that the standard values, execution factors, and other parameters are set correctly.
- Check Routing and Production Order: Review the routing and production order for any discrepancies. Ensure that the quantities and execution factors are realistic and within acceptable limits.
- Adjust Execution Factor: If the execution factor is too high, consider adjusting it to a more reasonable value that will not lead to an overflow in calculations.
- Consult SAP Documentation: Refer to SAP documentation or help resources for specific limits related to work calculations in your version of SAP.
- Error Handling: If the issue persists, consider implementing error handling procedures or consulting with your SAP support team for further analysis.
Related Information:
CR01
(Create Work Center), CA01
(Create Routing), or CO01
(Create Production Order) to review and modify the relevant configurations.By addressing the underlying causes and ensuring that all configurations and data entries are correct, you should be able to resolve the CI250 error effectively.
Get instant SAP help. Start your 7-day free trial now.
CI227
The maintenance package is not consistent
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CI206
Maint. package assignments from referenced task lists cannot be changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CI251
Operation &: Product duration (normal) x execution factor is too large
What causes this issue? The product of <ZH>duration x execution factor</> exceeds the duration display format. The product is determined ...
CI252
Operation &: Product duration (minimum) x execution factor is too large
What causes this issue? The product of <ZH>duration x execution factor</> exceeds the duration display format. The product is determined ...
Click on this link to search all SAP messages.