Do you have any question about this error?
Message type: E = Error
Message class: CGPL_MSP_INTERFACE - Project Planning - Interface to MS Project
Message number: 001
Message text: The specified Microsoft Project field is already assigned
The system does not assign the Microsoft Project field.
Change the existing assignment or assign a different Microsoft Project
field.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CGPL_MSP_INTERFACE001
- The specified Microsoft Project field is already assigned ?The SAP error message CGPL_MSP_INTERFACE001 indicates that there is an issue with the integration between SAP and Microsoft Project (MSP). Specifically, this error occurs when you attempt to assign a field in Microsoft Project that has already been assigned to another field in the SAP system. This can happen during the synchronization process between the two systems.
Cause:
- Field Conflict: The specified field in Microsoft Project is already mapped to another field in the SAP system, leading to a conflict.
- Incorrect Mapping: The mapping configuration between SAP and Microsoft Project may not be set up correctly, causing multiple assignments to the same field.
- Data Integrity Issues: There may be existing data in either system that conflicts with the new assignment you are trying to make.
Solution:
- Check Field Assignments: Review the field assignments in both SAP and Microsoft Project. Ensure that the field you are trying to assign is not already in use.
- Modify Mapping Configuration: If you find that the field is indeed already assigned, you may need to modify the mapping configuration in the SAP system to resolve the conflict. This can involve changing the field assignments or removing unnecessary mappings.
- Data Cleanup: If there are existing records that are causing the conflict, consider cleaning up the data in either SAP or Microsoft Project to ensure that the field can be assigned without issues.
- Consult Documentation: Refer to the SAP and Microsoft Project integration documentation for specific guidelines on field mappings and assignments.
- Testing: After making changes, perform a test synchronization to ensure that the error does not occur again.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CGPL_EDITMASK_XPRA000
& & & &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CGPL_DOC_INTERFACE001
Copying documents does not take versions and variants into account
What causes this issue? You have copied document &V1& for which there are either several versions or additional language variants.System Resp...
CGPL_MSP_INTERFACE002
Field assignment is already being processed by &. You can only display
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CGPL_MSP_INTERFACE003
There is a system error in lock management. You can only display
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.