Do you have any question about this error?
Message type: E = Error
Message class: CC - ECM: Messages
Message number: 269
Message text: No date shift (& is locked)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CC269
- No date shift (& is locked) ?The SAP error message CC269 "No date shift (& is locked)" typically occurs in the context of production planning and control, particularly when dealing with capacity planning and scheduling. This error indicates that the system is unable to perform a date shift for a specific operation or resource because it is locked, which can happen for various reasons.
Causes:
- Locked Resources: The resource or operation you are trying to shift may be locked due to ongoing processes, such as production orders that are currently being processed or scheduled.
- Planning Lock: The planning data for the specific period may be locked, preventing any changes to the scheduling.
- User Lock: A user may have locked the operation or resource for maintenance or other reasons.
- Configuration Issues: There may be configuration settings in the system that prevent date shifts under certain conditions.
Solutions:
- Check Locks: Investigate if the resource or operation is locked. You can use transaction codes like SM12 (to check user locks) or SM21 (to check system logs) to identify any locks that may be causing the issue.
- Release Locks: If you find that a lock is causing the issue, you may need to release it. This could involve waiting for the current process to complete or manually unlocking it if you have the necessary permissions.
- Review Scheduling Settings: Check the scheduling settings in the production order or the resource configuration to ensure that they allow for date shifts.
- Consult with Team: If the issue persists, consult with your SAP Basis or technical team to investigate further. They may need to check for any system-wide locks or issues.
- Reconfigure if Necessary: If the error is due to configuration settings, you may need to adjust these settings in the SAP system to allow for date shifts.
Related Information:
If the problem continues after trying these solutions, it may be beneficial to escalate the issue to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CC268
No date shift (inconsistency in dangerous good)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CC267
No date shift (dangerous good locked)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CC270
Deletion flag is set for leading change master record
What causes this issue? You want to process a change master record, but: It was created using the <ZH>change package</> function The <...
CC271
Deletion flag is set for this change master
What causes this issue? You want to process a change master record that has a deletion flag.System Response The system issues an error message and w...
Click on this link to search all SAP messages.