Do you have any question about this error?
Message type: E = Error
Message class: CC - ECM: Messages
Message number: 192
Message text: System status: the change is locked
You want to process an object (for example, a BOM or document) with
reference to the change number of an ECR.
The system checks the system status of the ECR (change header). The
system status is set to "locked", so you cannot process objects with
reference to this change master record.
You cannot change a change object with reference to this ECR unless the
system status is changed ("Unlock").
<DS:TRAN.CC32>Change ECR</>
Error message extract from SAP system. Copyright SAP SE.
CC192
- System status: the change is locked ?The SAP error message CC192, which states "System status: the change is locked," typically occurs when a user attempts to make changes to a configuration or master data in SAP that is currently locked for editing. This locking mechanism is in place to prevent concurrent changes that could lead to data inconsistencies.
Causes:
- User Lock: The user who is trying to make changes may have a lock on the object due to a previous session or transaction that was not properly closed.
- System Lock: The system may have a lock on the object due to a background job or another user currently editing the same object.
- Transport Lock: If the object is part of a transport request, it may be locked to prevent changes while the transport is being processed.
- Change Management: The object may be in a status that does not allow changes, such as being in a "released" state.
Solutions:
- Check Locks: Use transaction code
SM12
to check for any locks on the object. You can see which user or process is holding the lock and take appropriate action (e.g., ask the user to release the lock).- Release Locks: If you have the necessary authorizations, you can manually delete the lock entries in
SM12
. Be cautious with this approach, as it may lead to data inconsistencies if the lock is still needed.- Wait for Release: If the lock is due to another user or a background job, you may need to wait until the other user completes their task or the job finishes.
- Check Transport Requests: If the object is part of a transport request, ensure that the transport is completed and the object is unlocked.
- Review Object Status: Check the status of the object to ensure it is not in a state that prevents changes. You may need to change the status if applicable.
Related Information:
SM12
(to view and manage locks), SE09
/SE10
(to manage transport requests), and CC01
/CC02
(to create or change configuration).If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP Basis team or technical support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CC191
System status: the ECR is not yet converted to an ECO
What causes this issue? You want to process an object (for example, BOM or document) with reference to the change number of an ECR.System Response T...
CC190
System status: ECR is not yet approved
What causes this issue? You want to process an object (for example, BOM or document) with reference to the change number of an ECR.System Response T...
CC193
System status: the ECO is already confirmed
What causes this issue? You want to process a change object (such as a document) with reference to an ECO.System Response The system checks the syst...
CC194
System status: the ECO is already completed
What causes this issue? You want to process and object (for example, BOM or document) with reference to the change number of an ECO.System Response ...
Click on this link to search all SAP messages.