How To Fix CC074 - Date shift changes order


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CC - ECM: Messages

  • Message number: 074

  • Message text: Date shift changes order

  • Show details Hide details
  • What causes this issue?

    You want to carry out a date shift for a change number.
    This change of valid-from date means that the sequence of effectivity
    periods is changed. The system recalculates the new valid-to date for
    each period.

    How to fix this error?

    If you still want to change the date, confirm this message.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CC074 - Date shift changes order ?

    The SAP error message CC074 "Date shift changes order" typically occurs in the context of production planning and control when there are issues related to the scheduling of production orders. This error indicates that there is a discrepancy in the dates associated with the production order, which can arise from various factors such as changes in the order's start or finish dates, or conflicts with the availability of resources.

    Causes:

    1. Date Changes: The start or finish dates of the production order have been changed, leading to a conflict with the scheduling.
    2. Resource Availability: Changes in resource availability (e.g., machines, labor) that affect the planned dates of the order.
    3. Dependencies: Dependencies on other orders or operations that have been altered, causing a shift in the planned dates.
    4. Capacity Planning: Issues in capacity planning that result in the inability to meet the scheduled dates.
    5. Configuration Issues: Incorrect configuration in the production planning settings that may lead to date conflicts.

    Solutions:

    1. Review Order Dates: Check the start and finish dates of the production order and ensure they are correctly set according to the production schedule.
    2. Check Resource Availability: Verify the availability of resources and adjust the order dates accordingly if there are conflicts.
    3. Adjust Dependencies: If the order is dependent on other orders, ensure that those orders are scheduled correctly and that their dates align with the current order.
    4. Capacity Check: Perform a capacity check to ensure that the resources required for the order are available during the planned dates.
    5. Re-schedule the Order: If necessary, re-schedule the production order to align with the current production plan and resource availability.
    6. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling date shifts and related configurations.

    Related Information:

    • Transaction Codes: You may use transaction codes like CO02 (Change Production Order) or CO03 (Display Production Order) to review and modify production orders.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • User Exits and BAdIs: If custom logic is implemented in your SAP system, review any user exits or BAdIs that may affect order scheduling.
    • Training and Support: Consider training for users involved in production planning to better understand how to manage order dates and scheduling effectively.

    If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP production planning.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant