How To Fix CC029 - First select alternative dates


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CC - ECM: Messages

  • Message number: 029

  • Message text: First select alternative dates

  • Show details Hide details
  • What causes this issue?

    You want to assign an <DS:GLOS.3526BE97AFAB52B9E10000009B38F974>
    alternative date</> to an object. However, you have not selected an
    object.

    System Response

    The system does not make an assignment.

    How to fix this error?

    First select an alternative date and then choose <LS>Object assignment
    </>.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CC029 - First select alternative dates ?

    The SAP error message CC029, which states "First select alternative dates," typically occurs in the context of planning or scheduling activities within SAP, particularly in modules like SAP Controlling (CO) or Production Planning (PP). This error indicates that the system requires you to specify alternative dates before proceeding with the operation you are attempting to perform.

    Cause:

    The error is usually triggered when:

    1. You are trying to execute a planning transaction that requires alternative dates to be defined, but none have been selected.
    2. The system expects you to provide a range of dates or specific alternative dates for the planning process, and this information is missing.

    Solution:

    To resolve the CC029 error, follow these steps:

    1. Select Alternative Dates:

      • Go back to the screen where you encountered the error.
      • Look for fields or options related to "Alternative Dates" or "Date Selection."
      • Enter the required alternative dates as prompted by the system.
    2. Check Configuration:

      • If you are unsure about the required dates, consult with your SAP configuration team or refer to the documentation for the specific transaction you are using.
      • Ensure that the planning parameters are correctly set up in the system.
    3. Review User Input:

      • Double-check your input for any mistakes or omissions.
      • Make sure that you are following the correct sequence of steps as required by the transaction.
    4. Consult Documentation:

      • Refer to SAP help documentation or user manuals for the specific module you are working with to understand the requirements for alternative dates.
    5. Seek Help from SAP Support:

      • If the issue persists after trying the above steps, consider reaching out to your SAP support team or consulting SAP Notes for any known issues related to this error.

    Related Information:

    • Transaction Codes: The error may occur in various transaction codes related to planning, such as CCO1 (Create Cost Center Planning) or CCO2 (Change Cost Center Planning).
    • SAP Notes: Check SAP Notes for any updates or patches that may address this error.
    • User Roles: Ensure that you have the necessary authorizations to perform the planning activities you are attempting.

    By following these steps, you should be able to resolve the CC029 error and proceed with your planning activities in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author