Message type: E = Error
Message class: CC - ECM: Messages
Message number: 003
Message text: No change made to change number &
For change number &V1& you have chosen the <ZH>save</> function, but
no data has been changed or added.
Error message extract from SAP system. Copyright SAP SE.
CC003
- No change made to change number & ?The SAP error message CC003 ("No change made to change number &") typically occurs in the context of Change Management within SAP's Project System (PS) or Production Planning (PP) modules. This error indicates that an attempt was made to modify a change number, but no actual changes were detected or made.
Causes:
- No Changes Detected: The most common cause is that the system did not find any changes to apply to the specified change number. This can happen if the data you are trying to change is already in the desired state.
- Authorization Issues: The user may not have the necessary authorizations to make changes to the change number.
- Incorrect Change Number: The change number specified may not exist or may not be valid for the operation being performed.
- Status of Change Number: The change number may be in a status that does not allow changes (e.g., it may be locked or already completed).
- Data Consistency Issues: There may be inconsistencies in the data that prevent the system from processing the change.
Solutions:
- Verify Changes: Check the data you are trying to change and ensure that there are actual modifications to be made. If the data is already in the desired state, no changes will be applied.
- Check Authorization: Ensure that you have the necessary authorizations to make changes to the change number. Consult with your SAP security team if needed.
- Validate Change Number: Confirm that the change number you are using is valid and exists in the system. You can do this by checking the change number in the relevant transaction.
- Review Status: Check the status of the change number to ensure it is not locked or in a state that prevents changes. You may need to unlock it or change its status if applicable.
- Consult Documentation: Review SAP documentation or help resources for any specific requirements or conditions related to the change number you are working with.
- Debugging: If you have access to technical resources, consider debugging the process to identify any underlying issues that may not be immediately apparent.
Related Information:
CC01
(Create Change Number), CC02
(Change Change Number), and CC03
(Display Change Number) to manage change numbers effectively.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CC002
Change number & changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CC001
Change number & created
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CC004
Change number & already exists
What causes this issue? You want to create a change master with change number &V1&. This number has already been used for a change master.How...
CC005
Change number & does not exist
What causes this issue? One of the following situations caused the error message: You want to edit a BOM or routing using change number &V1&....
Click on this link to search all SAP messages.