Message type: E = Error
Message class: CAP4 - APO Integration of Work Center and Capacity
Message number: 006
Message text: Selected unit does not agree with dimension & of the resource
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CAP4006
- Selected unit does not agree with dimension & of the resource ?The SAP error message CAP4006 indicates that there is a mismatch between the selected unit of measure and the dimension of the resource in the context of capacity planning or production planning. This error typically arises when the unit of measure used for a resource does not align with the expected dimensions defined in the system.
Cause: Unit of Measure Mismatch: The unit of measure selected for the operation or resource does not match the unit of measure defined for the resource in the system. Resource Configuration: The resource may be configured with specific dimensions (e.g., hours, pieces, etc.) that are not compatible with the unit of measure being used. Master Data Issues: There may be inconsistencies in the master data for the resource or the material being processed.
Solution: Check Resource Configuration: Go to the resource master data and verify the unit of measure settings. Ensure that the unit of measure aligns with the expected dimensions. Adjust
Get instant SAP help. Sign up for our Free Essentials Plan.
CAP4005
Specify a dimension for the storage characteristic of the resource
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CAP4004
Specify a value for the maximum overlap of activities
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CAP4007
Minimum production quantity is greater than the maximum warehouse stock
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CAP4008
Specify a value for the capacity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.