Message type: E = Error
Message class: CACSSESRUN - Settlement Schedule Run and Reversal
Message number: 001
Message text: Counters for database commits of application &1 cannot be read
The commit counter of your application for the <ZH>settlement schedule
run</> process cannot be read.
Check whether a commit counter has been defined in Customizing for this
application.
Contact your system administrator.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CACSSESRUN001
- Counters for database commits of application &1 cannot be read ?The SAP error message CACSSESRUN001 indicates that the system is unable to read the counters for database commits of a specific application. This error typically arises in the context of SAP Convergent Charging (SAP CC) or similar applications that rely on database transactions.
Cause: Database Connectivity Issues: There may be issues with the connection to the database, such as network problems or database server downtime. Configuration Errors: Incorrect configuration settings in the application or database can lead to this error. Missing or Corrupted Data: The counters or related data in the database may be missing or corrupted. Authorization Issues: The user or service account running the application may not have the necessary permissions to access the required database tables or views. System Performance Issues: High load on the database or application server can lead to timeouts or failures in reading the required data.
Solution: Check Database Connectivity: Ensure that the database is up and running and that there
Get instant SAP help. Sign up for our Free Essentials Plan.
CACSSESRUN000
System error; run journal cannot be written
What causes this issue? The general run log (table CACS_STMRNJO) cannot be written to the database.System Response The system cannot carry out the s...
CACSSESMD014
Incorrect call of function module &
What causes this issue? A specific commission contract is currently being processing. At the same time, external data transfer (EDT) is attempting to...
CACSSESRUN002
Run log &1 cannot be created
What causes this issue? The general run log (CACS_STMRNJO) for the settlement schedule run cannot be created. The system issues an error message and ...
CACSSESRUN003
Contract &1 is currently locked
What causes this issue? It is not possible to lock the contract exclusively. This contract is posssibly locked for processing by another user at the ...
Click on this link to search all SAP messages.