Do you have any question about this error?
Message type: E = Error
Message class: CACSPH - Period Management
Message number: 034
Message text: Cannot generate: Existing periods are inconsistent
You are attempting to generate new
<DS:GLOS.4483C42EF61F3D96E10000000A155435>periods</> for
<DS:GLOS.39C3277B9F7A4EC7E10000000A114224>period rule</>&v1& (version
&v2&). However the check of existing periods has detected that
inconsistencies exist. The following error was detected:
&v3&&v4&
The generation of periods in canceled.
Check the periods for period rule &v1& (version &v2&).
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CACSPH034
- Cannot generate: Existing periods are inconsistent ?The SAP error message CACSPH034: Cannot generate: Existing periods are inconsistent typically occurs in the context of SAP Controlling (CO) or SAP Project System (PS) when there are inconsistencies in the period settings or data that prevent the system from generating the required periods for a project or controlling area.
Causes:
- Inconsistent Period Settings: The fiscal year variant or period settings may not be consistent across different modules or components.
- Missing or Incorrect Configuration: There may be missing configuration in the controlling area or project settings that leads to inconsistencies.
- Data Entry Errors: Manual data entry errors in the project or controlling area can lead to inconsistencies in the periods.
- Locked Periods: The periods may be locked for posting, which can prevent the generation of new periods.
- Changes in Master Data: Changes in master data (like cost centers, internal orders, etc.) that are not reflected in the periods can cause inconsistencies.
Solutions:
Check Period Settings: Review the period settings in the controlling area and ensure they are consistent with the fiscal year variant.
- Transaction Codes:
OB52
(for controlling area) andOB29
(for fiscal year variant).Review Configuration: Ensure that all necessary configurations for the controlling area and project are correctly set up.
- Check the configuration in the SPRO transaction under Controlling settings.
Data Consistency Check: Use transaction codes like
CKM3
orCJI3
to check for inconsistencies in the data related to the project or controlling area.Unlock Periods: If the periods are locked, you may need to unlock them temporarily to allow for the generation of new periods.
- Use transaction code
OB52
to adjust the period settings.Correct Master Data: Review and correct any inconsistencies in the master data that may be affecting the periods.
Consult SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
Related Information:
CJ20N
(Project Builder), CJI3
(Project Actual Line Items), and KSB1
(Cost Centers: Actual Line Items).If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP Basis or functional team for further investigation and resolution.
Get instant SAP help. Start your 7-day free trial now.
CACSPH033
Cannot generate runtime object for application &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CACSPH032
Error while calculating follow-on prd for prd &1 (&2), prd rule &3 (&4)
What causes this issue? The <DS:GLOS.4483C42EF61F3D96E10000000A155435>period</> following period &V1& (&V2&) and <DS:G...
CACSPH035
Error while changing period &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CACSPH036
Saving changes has failed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.