Do you have any question about this error?
Message type: E = Error
Message class: CACSPH - Period Management
Message number: 032
Message text: Error while calculating follow-on prd for prd &1 (&2), prd rule &3 (&4)
The <DS:GLOS.4483C42EF61F3D96E10000000A155435>period</> following period
&V1& (&V2&) and <DS:GLOS.39C3277B9F7A4EC7E10000000A114224>period rule
</> &V3& (&V4&) cannot be calculated dynamically during runtime.
Further processing cannot be continued.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the generated periods for period rule &V3& (&V4&).
If possible, generate the missing periods for period rule &V3& (&V4&).
Error message extract from SAP system. Copyright SAP SE.
CACSPH032
- Error while calculating follow-on prd for prd &1 (&2), prd rule &3 (&4) ?The SAP error message CACSPH032 typically occurs in the context of production planning and control, particularly when dealing with production orders and their follow-on processes. This error indicates that there is an issue with calculating the follow-on production order for a given production order (PRD) and its associated production rule.
Causes:
- Missing or Incorrect Data: The production order may have missing or incorrect data, such as material master data, routing information, or production version.
- Configuration Issues: There may be issues with the configuration of the production rules or the production process in the system.
- Inconsistent Master Data: The master data for materials, BOMs (Bill of Materials), or routings may be inconsistent or not properly maintained.
- Capacity Constraints: There may be capacity constraints in the production planning that prevent the calculation of follow-on production.
- Authorization Issues: The user may not have the necessary authorizations to perform the operation.
Solutions:
- Check Production Order Data: Review the production order for any missing or incorrect information. Ensure that all required fields are filled out correctly.
- Verify Master Data: Check the material master, BOM, and routing for the relevant production order to ensure they are correctly configured and consistent.
- Review Production Rules: Ensure that the production rules are correctly set up and that they correspond to the production order being processed.
- Capacity Planning: Check the capacity planning settings to ensure that there are no constraints that would prevent the calculation of follow-on production.
- User Authorizations: Verify that the user has the necessary authorizations to perform the operation related to the production order.
- Consult SAP Notes: Look for any relevant SAP Notes that may address this specific error message or provide additional troubleshooting steps.
Related Information:
By following these steps, you should be able to identify the root cause of the CACSPH032 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CACSPH031
No follow-on period exists for period &1 (&2), period rule &3 (&4)
What causes this issue? No follow-on period exists for <DS:GLOS.4483C42EF61F3D96E10000000A155435>period</> &V1& (&V2&) an...
CACSPH030
Invalid call of method &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CACSPH033
Cannot generate runtime object for application &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CACSPH034
Cannot generate: Existing periods are inconsistent
What causes this issue? You are attempting to generate new <DS:GLOS.4483C42EF61F3D96E10000000A155435>periods</> for <DS:GLOS.39C3277B9...
Click on this link to search all SAP messages.