Do you have any question about this error?
Message type: E = Error
Message class: CA - CIM messages: ABAP reporting
Message number: 280
Message text: No valid PRT found for key date &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CA280
- No valid PRT found for key date & ?The SAP error message CA280 "No valid PRT found for key date &" typically occurs in the context of Production Resource Tools (PRT) in SAP. This error indicates that the system could not find a valid PRT for the specified key date, which is often related to production planning or execution processes.
Cause:
- Invalid Key Date: The key date specified in the transaction may not correspond to any valid PRT in the system.
- PRT Not Assigned: The PRT may not be assigned to the relevant work center or production order.
- PRT Validity Period: The PRT may have a validity period that does not include the key date. For example, if the PRT is only valid from a future date, it will not be found for past or current dates.
- Configuration Issues: There may be configuration issues in the PRT settings or in the work center settings.
Solution:
- Check Key Date: Verify the key date you are using in the transaction. Ensure it is correct and corresponds to the expected timeframe.
- Review PRT Assignment: Check if the PRT is correctly assigned to the relevant work center or production order. You can do this by navigating to the work center configuration and reviewing the PRT assignments.
- Validate PRT Validity: Look at the validity dates of the PRT. Ensure that the PRT is valid for the key date you are using. If necessary, adjust the validity dates.
- Create or Update PRT: If no valid PRT exists for the key date, you may need to create a new PRT or update an existing one to ensure it is valid for the required timeframe.
- Check Configuration: Review the configuration settings for PRTs and work centers in the SAP system to ensure everything is set up correctly.
Related Information:
CR01
(Create Work Center), CR02
(Change Work Center), or CR03
(Display Work Center) to manage work centers and their associated PRTs.C223
(Maintain PRT).By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CA279
You cannot change the task list with type &
What causes this issue? You have selected a task list with the type &V1&. Branching from the object overview to task list maintenance is not...
CA278
Process session &
What causes this issue? You have generated the batch session &V1& in order to replace the object at a later time.How to fix this error? If y...
CA281
The new work center & & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CA282
The work centers have different standard value keys (& and &)
What causes this issue? You want to replace a work center. The new work center has a different standard value key as the old work center. A standard ...