Message text: Lack of capacity in order &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C7091
- Lack of capacity in order &1 ?The SAP error message C7091, which states "Lack of capacity in order &1," typically occurs when there is insufficient capacity available in a production order or a work center to fulfill the planned operations. This can happen for various reasons, such as:
Causes:
- Capacity Overload: The work center has more planned work than its available capacity during the specified time period.
- Incorrect Capacity Planning: The capacity settings for the work center may not be configured correctly, leading to discrepancies in available capacity.
- Resource Availability: Resources (machines, labor, etc.) may be unavailable due to maintenance, breakdowns, or other scheduling conflicts.
- Incorrect Order Dates: The production order may be scheduled for a time when the work center is not available.
- Capacity Constraints: There may be specific constraints set in the system that limit the amount of work that can be processed at a given time.
Solutions:
- Review Capacity Planning: Check the capacity planning for the work center to ensure that it is set up correctly. Adjust the available capacity if necessary.
- Reschedule Orders: If possible, reschedule the production order to a time when the work center has available capacity.
- Adjust Production Order: Modify the production order to reduce the load or split it into smaller orders that can be processed sequentially.
- Increase Capacity: If feasible, consider increasing the capacity of the work center by adding shifts, overtime, or additional resources.
- Check Resource Availability: Ensure that all necessary resources are available and not scheduled for maintenance or other conflicting tasks.
- Analyze Load: Use SAP tools to analyze the load on the work center and identify any bottlenecks or issues that need to be addressed.
Related Information:
CM01
(Capacity Planning) or CM21
(Capacity Leveling) to analyze and manage capacity issues.S_ALR_87013558
(Capacity Evaluation) to get insights into capacity utilization and availability.CR01
to ensure that all parameters are set correctly.By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the C7091 error and ensure smooth production operations.
Get instant SAP help. Start your 7-day free trial now.
C7090
Scheduling: Multiple commitment due to constraint dates
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7086
In-house production time determined is greater than 999 days
What causes this issue? During scheduling, an inhouse production time greater than 999 days was calculated.System Response The system uses a maximum...
C7100
**** Messages which are not written into the log
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7101
Forward scheduling (enter start date)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.