Do you have any question about this error?
Message type: E = Error
Message class: C7 - Scheduling
Message number: 086
Message text: In-house production time determined is greater than 999 days
During scheduling, an inhouse production time greater than 999 days was
calculated.
The system uses a maximum inhouse production time of 999 days.
Please check your master data.
Error message extract from SAP system. Copyright SAP SE.
C7086
- In-house production time determined is greater than 999 days ?The SAP error message C7086 indicates that the in-house production time for a material is set to a value greater than 999 days, which is not acceptable in the system. This error typically arises during the planning or production processes when the system attempts to calculate production lead times based on the material master data.
Cause:
- Material Master Data: The in-house production time is defined in the material master record. If this value exceeds 999 days, the system will trigger this error.
- Configuration Issues: There may be incorrect settings in the configuration of the material or production planning parameters.
- Data Entry Errors: Manual entry errors during the creation or modification of the material master data can lead to unrealistic values being set.
Solution:
Check Material Master Data:
- Go to the material master record (transaction code MM03).
- Check the "MRP" (Material Requirements Planning) view or the "Production" view.
- Look for the field "In-house production time" and verify its value.
Adjust the In-house Production Time:
- If the value is greater than 999 days, update it to a realistic value (less than or equal to 999 days).
- Save the changes.
Review Configuration:
- If the issue persists or if you are unsure about the correct value, consult with your production planning team or SAP configuration team to ensure that the settings align with your business processes.
Data Validation:
- Implement validation checks to prevent future occurrences of this error. This can include setting up input validation rules in the material master data entry process.
Related Information:
By following these steps, you should be able to resolve the C7086 error and ensure that your in-house production times are set correctly within the acceptable range.
Get instant SAP help. Start your 7-day free trial now.
C7085
Repetitive maufacturing: Midpoint sched. around work center &1 not poss.
What causes this issue? In the planning table for repetitive manufacturing, you are working with midpoint scheduling based on the "planning oper...
C7084
WBS element &1: Scheduled finish comes after the basic finish date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7090
Scheduling: Multiple commitment due to constraint dates
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7091
Lack of capacity in order &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.