Message type: E = Error
Message class: C7 - Scheduling
Message number: 059
Message text: Detailed scheduling level - Order &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C7059
- Detailed scheduling level - Order & ?The SAP error message C7059, which pertains to "Detailed scheduling level - Order &," typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that there is an issue with the detailed scheduling settings for a specific order.
Cause: The error can arise due to several reasons, including: Missing Configuration: The detailed scheduling level for the order may not be properly configured in the system. Incorrect Order Type: The order type may not be compatible with the detailed scheduling settings. Master Data Issues: There may be missing or incorrect master data related to the materials, resources, or production versions. Scheduling Parameters: The scheduling parameters for the plant or production line may not be set correctly. Capacity Constraints: There may be capacity constraints that prevent the system from scheduling the order properly.
Solution: To resolve the C7059 error, you can take the following steps: Check Configuration: Verify the detailed scheduling configuration in the SAP system.
Get instant SAP help. Sign up for our Free Essentials Plan.
C7058
Relationships to other standard networks exist
What causes this issue? In this standard network, there are relationships to other standard networks.System Response The system ignores the relation...
C7057
No valid capacity for finite scheduling
What causes this issue? No capacity, next to which the indicator <ZH>relevant for finite scheduling</> has been placed, is assigned to th...
C7060
Rate-based scheduling level - Order &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7061
Rough-cut scheduling level - Order &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.