Message type: E = Error
Message class: C2 - Other messages production orders
Message number: 403
Message text: Product Cost Collector and Event-Based Potsing is not supported
In the result analysis key &V1& event-based posting is activated and a
product cost collector should be used as cost object.
This combination of result analysis key and usage of a product cost
collector as cost object is not allowed.
Change either the result analysis key or remove the check at the cost
collector indicator.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
C2403
- Product Cost Collector and Event-Based Potsing is not supported ?The SAP error message C2403, which states "Product Cost Collector and Event-Based Posting is not supported," typically occurs in the context of product costing and production processes within SAP. This error indicates that there is a conflict between the use of Product Cost Collectors and the event-based posting method in the system.
Cause: Incompatibility: The error arises because the system does not support the combination of Product Cost Collectors with event-based postings. Event-based postings are typically used in scenarios where costs are posted based on specific events (like goods movements), while Product Cost Collectors are used for tracking costs in production orders or projects.
Configuration Issues: There may be configuration settings in the controlling (CO) module that are not aligned with the intended use of Product Cost Collectors and event-based postings. Incorrect Document Type: The document type being used may not be compatible with the Product Cost Collector.
Solution: Review Configuration: Check the configuration settings in
Get instant SAP help. Sign up for our Free Essentials Plan.
C2402
Orders without finished material are not supported by Event-Based Posting
What causes this issue? Order &V1& is created without a finished material and event-based posting is active for this order. Event-based posti...
C2401
Sales order or project stock are not supported by Event-Based Posting
What causes this issue? Order &V1& is created for sales order or project stock and event-based posting is active for this order. Event-based ...
C2404
Settlement Rule not supported by Event-Based Posting
What causes this issue? Order &V1& contains a settlement rule for a receiver other than material and event-based posting is active for this o...
C2405
Event-Based Posting requires full Settlement of Order Costs to Material
What causes this issue? Order &V1& contains a settlement rule for material as receiver with less than 100% settlement of the costs. Event-bas...
Click on this link to search all SAP messages.