Message type: E = Error
Message class: C+ -
Message number: 756
Message text: Material price determination performed with reduced actual BOM
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C+756
- Material price determination performed with reduced actual BOM ?The SAP error message C+756 indicates that the material price determination process was executed using a reduced actual Bill of Materials (BOM). This typically occurs when the system is unable to find all the components of the BOM for a material, which can lead to discrepancies in the cost calculation.
Cause: Incomplete BOM: The BOM for the material may not include all the necessary components, or some components may be marked as inactive. BOM Versioning: The system might be using a different version of the BOM that does not include all components. Material Master Data Issues: There may be issues with the material master data, such as incorrect settings or missing information. Configuration Settings: The configuration settings for material price determination may not be set up correctly, leading to the use of an incomplete BOM.
Solution: Check BOM: Verify the BOM for the material in question. Ensure that all required components are included and that the BOM
Get instant SAP help. Sign up for our Free Essentials Plan.
C+755
Price of procurement alt. &4 changes in currency/valuation &1 by &2 %
What causes this issue? The system is attempting to perfform multi-level price determination for procurement alternative &v4&. You have indic...
C+754
Price of procurement alternative &1 is negative
What causes this issue? You are attempting to perform a multi-level price determination for the material. However, a negative price was calculated fo...
C+757
Checking against the V price in the previous period is not possible
What causes this issue? No material ledger master data exists for the material in the previous period. Therefore, checking against the moving price (...
C+758
Field overflow for price of procurement alternative &1 (currency &2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.