Do you have any question about this error?
Message type: E = Error
Message class: C+ -
Message number: 752
Message text: Input quantities are reduced to avoid negative price in the proc. alt.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C+752
- Input quantities are reduced to avoid negative price in the proc. alt. ?The SAP error message C+752 indicates that the system has adjusted input quantities in a production alternative to prevent a negative price from being calculated. This typically occurs in the context of production planning and costing, where the system is trying to ensure that the total costs do not exceed the total revenues, which could lead to negative pricing.
Cause:
Negative Price Calculation: The error arises when the system detects that the calculated price for a production alternative would be negative. This can happen due to various reasons, such as:
- Incorrectly configured cost elements or cost centers.
- Incorrectly entered quantities or prices in the production order or bill of materials (BOM).
- Changes in the cost structure that lead to a situation where the total costs exceed the expected revenues.
Costing Variances: If there are significant variances in the costs of materials, labor, or overhead, it can lead to a situation where the calculated price for the production alternative becomes negative.
Data Inconsistencies: Inconsistencies in master data, such as material master records, BOMs, or routing information, can also lead to this error.
Solution:
Review Costing Data: Check the costing data for the production alternative. Ensure that all cost elements are correctly configured and that there are no discrepancies in the cost structure.
Check Input Quantities: Review the input quantities for the production order or BOM. Ensure that the quantities are realistic and that they align with the expected production levels.
Adjust Prices: If necessary, adjust the prices of the materials or services involved in the production process to ensure that they do not lead to a negative price calculation.
Analyze Variances: Investigate any significant variances in costs that may have led to this situation. This may involve looking at recent changes in material prices, labor rates, or overhead allocations.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling this error message. There may be additional configuration settings or best practices that can help prevent this issue.
Engage with SAP Support: If the issue persists and cannot be resolved through the above steps, consider reaching out to SAP support for further assistance. They may provide insights based on the specific configuration and usage of your SAP system.
Related Information:
By addressing the underlying causes and following the suggested solutions, you should be able to resolve the C+752 error and prevent it from occurring in the future.
Get instant SAP help. Start your 7-day free trial now.
C+751
No apportionment structure found. Costs were not copied
What causes this issue? No <DS:GLOS.3526B745AFAB52B9E10000009B38F974>apportionment structure</> with valid <DS:GLOS.3526B67EAFAB52B9E1...
C+750
No apportionment structure found. Costs are copied over completely
What causes this issue? No <DS:GLOS.3526B745AFAB52B9E10000009B38F974>apportionment structure</> with valid <DS:GLOS.3526B67EAFAB52B9E1...
C+753
Input quantities reduced to reduce price variances in the procurement alt
What causes this issue? The system is attempting to perform multi-level price determination for procurement alternative &v4&. You have specif...
C+754
Price of procurement alternative &1 is negative
What causes this issue? You are attempting to perform a multi-level price determination for the material. However, a negative price was calculated fo...
Click on this link to search all SAP messages.