How To Fix BUPA_HIERARCHY013 - Stated period is not in the period of the higher-level node


SAP Error Message - Details

  • Message type: E = Error

  • Message class: BUPA_HIERARCHY - BP Group Hierarchy

  • Message number: 013

  • Message text: Stated period is not in the period of the higher-level node

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message BUPA_HIERARCHY013 - Stated period is not in the period of the higher-level node ?
    The SAP error message BUPA_HIERARCHY013 indicates that there is a mismatch between the time period specified for a business partner and the time period of its higher-level node in a hierarchy. This typically occurs in scenarios where business partners are organized in a hierarchical structure, and the time validity of the higher-level node does not encompass the time validity of the lower-level node.
    
    Cause: Time Period Mismatch: The specified period for the business partner (the lower-level node) is outside the time period defined for its higher-level node. For example, if the higher-level node is valid from January 1, 2020, to December 31, 2022, and the lower-level node is set for a period from January 1, 2023, to December 31, 2023, this error will occur. Incorrect Hierarchical Structure: The hierarchy may not be set up correctly, leading to inconsistencies in the time periods. Data Entry Errors: Manual entry errors when defining the validity periods for

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant