How To Fix BUDC000 - Budget check not possible for Plant &1 and Order type &2


BUDC000 - Overview

  • Message type: E = Error

  • Message class: BUDC - Messages for Retraction and Budget check in PM order

  • Message number: 000

  • Message text: Budget check not possible for Plant &1 and Order type &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message BUDC000 - Budget check not possible for Plant &1 and Order type &2 ?
    The SAP error message BUDC000 indicates that a budget check is not possible for a specific plant and order type. This error typically arises in the context of budget management within SAP, particularly when dealing with internal orders, projects, or cost centers.
    
    Cause: Budget Not Defined: The budget for the specified plant and order type may not be defined or may not be available for the current period. Budget Availability Control: The budget availability control settings may not be properly configured for the order type or plant. Incorrect Configuration: There may be incorrect settings in the configuration of the controlling area, order type, or budget profile. Period Closing: The budget period may be closed, preventing any further budget checks or postings. Authorization Issues: The user may not have the necessary authorizations to perform budget checks for the specified plant and order type.
    Solution: Check Budget Definition: Verify that a budget has been defined for the specified plant and

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant