Do you have any question about this error?
Message type: E = Error
Message class: BUAVC - Generic message class AVC
Message number: 513
Message text: Checking horizon &1 does not exist
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BUAVC513
- Checking horizon &1 does not exist ?The SAP error message BUAVC513, which states "Checking horizon &1 does not exist," typically occurs in the context of the Availability Control (AVC) functionality in SAP. This error indicates that the system is trying to reference a checking horizon that has not been defined in the system.
Cause:
- Missing Configuration: The checking horizon that the system is trying to use has not been configured in the system.
- Incorrect Settings: There may be a mismatch in the settings or parameters that define the checking horizon.
- Data Entry Error: The checking horizon might have been incorrectly entered or referenced in a transaction or configuration.
Solution:
Define the Checking Horizon:
- Go to the configuration settings for Availability Control in SAP.
- Navigate to the relevant path (usually found under
SPRO
->Controlling
->Budgeting
->Availability Control
).- Check if the checking horizon is defined. If not, create a new checking horizon with the required parameters.
Check Existing Configurations:
- Review the existing configurations for any discrepancies or errors.
- Ensure that the checking horizon is correctly assigned to the relevant controlling area or budget structure.
Transaction Codes:
- Use transaction codes like
OKKP
(for controlling area settings) orS_ALR_87013558
(for budget reports) to check the settings related to availability control.Consult Documentation:
- Refer to SAP documentation or help files for detailed instructions on how to set up and manage checking horizons.
Testing:
- After making changes, test the configuration by executing the transaction that previously generated the error to ensure that the issue is resolved.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP Basis or functional team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
BUAVC512
Invalid combination of message type and availability control event
What causes this issue? You have entered an <DS:DE.BUAVC_EVENT>availability control event</> for a tolerance limit with <DS:DE.BUAVC_M...
BUAVC511
Availability control event &1 (application component &2) does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BUAVC514
Data source &1 is not valid for ledger &3: wrong application component
What causes this issue? The <DS:DE.BUAVC_ALSRC>data source for control ledger</> &V1& cannot be selected for the availability con...
BUAVC515
Currency key missing for the tolerance profile &1
What causes this issue? The <DS:DE.BUAVC_TOLPROF>tolerance profile</> &V1& ( <DS:DE.BUAVC_APPLIC>application component</...
Click on this link to search all SAP messages.