Do you have any question about this error?
Message type: E = Error
Message class: BP - Budgeting and planning
Message number: 759
Message text: Perform reconstruction of releases and assigned values for &1/&2
You are changing the activation state of the cover eligibility for FM
area &V1& and fiscal year &V2&. The activation causes an extended check
of the availability control to take place during postings. For German
Government customers, this check is also the prerequisite that budget
eligible for cover and budget ineligible for cover can be released
separately.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If you have worked with releases, you must execute the following
programs:
<DS:TRAS.FR92>Redistribution to release groups</>
<DS:TRAS.FMBV>Reconstruction assigned values</>
Error message extract from SAP system. Copyright SAP SE.
BP759
- Perform reconstruction of releases and assigned values for &1/&2 ?The SAP error message BP759, which states "Perform reconstruction of releases and assigned values for &1/&2," typically occurs in the context of Business Partner (BP) management and is related to the assignment of values and releases in the system. This error can arise due to inconsistencies or issues with the data related to business partners, particularly when there are changes in the underlying data structure or when certain processes have not been completed correctly.
Cause:
- Data Inconsistency: The error often indicates that there is a mismatch or inconsistency in the data related to the business partner, such as missing or incorrect assignment of values.
- Incomplete Processes: If certain processes related to the business partner have not been completed (e.g., changes in the business partner's data), it can lead to this error.
- Configuration Issues: There may be configuration issues in the system that prevent the proper assignment of values or releases.
Solution:
Reconstruction of Releases: The primary solution is to perform the reconstruction of releases and assigned values. This can typically be done through the following steps:
- Navigate to the relevant transaction in SAP (e.g., transaction code BP for Business Partner).
- Look for options related to "Reconstruction" or "Reassign Values."
- Follow the prompts to complete the reconstruction process.
Check Data Consistency: Use transaction codes like
BP
orSLG1
(Application Log) to check for any inconsistencies in the business partner data. Ensure that all required fields are filled out correctly.Review Change Logs: Check the change logs for the business partner to identify any recent changes that may have led to the error. This can help in pinpointing the exact cause.
Consult Documentation: Refer to SAP documentation or notes related to the specific version of SAP you are using. There may be specific notes or patches that address this error.
Contact SAP Support: If the issue persists after attempting the above solutions, consider reaching out to SAP support for further assistance. They may provide additional insights or solutions based on the specific context of your system.
Related Information:
BP
(Business Partner), SLG1
(Application Log), and others that may help in troubleshooting.By following these steps, you should be able to address the BP759 error and ensure that your business partner data is consistent and correctly configured.
Get instant SAP help. Start your 7-day free trial now.
BP758
Caution: You are changing the hierarchy settings for avail. control ->
What causes this issue? When deleting an entry you change the behaviour of the availability control within the hierarchy. If you have made only one e...
BP757
Availabty ctrl against total, despite abilty to only maintain annual vals
What causes this issue? Availability control in fund &V1& runs against overall values, although only annual values have been maintained.How t...
BP760
The assigned data for the posting is locked by user &1
What causes this issue? The assigned data needed to check your posting is currently being processed by user &V1&. The data is therefore block...
BP761
System error when locking the assigned data you processed
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
Click on this link to search all SAP messages.