How To Fix BP396 - Balance commitment &1 can not be processed


BP396 - Overview

  • Message type: E = Error

  • Message class: BP - Budgeting and planning

  • Message number: 396

  • Message text: Balance commitment &1 can not be processed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message BP396 - Balance commitment &1 can not be processed ?
    The SAP error message BP396, which states "Balance commitment &1 cannot be processed," typically occurs in the context of budget management and commitment accounting within SAP. This error indicates that there is an issue with processing a balance commitment for a specific budget or cost center.
    Causes:
    
    Invalid Commitment: The commitment referenced may not exist or may have been deleted.
    Budget Availability: There may not be sufficient budget available to cover the commitment.
    Incorrect Configuration: The configuration settings for budget control may not be set up correctly.
    Document Status: The document associated with the commitment may be in a status that does not allow processing (e.g., blocked or not released).
    Authorization Issues: The user may not have the necessary authorizations to process the commitment.
    
    Solutions:
    
    Check Commitment: Verify that the commitment referenced in the error message exists and is valid. You can do this by checking the relevant budget or commitment reports.
    Review Budget Availability: Ensure that there is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant