Do you have any question about this error?
Message type: E = Error
Message class: BP - Budgeting and planning
Message number: 048
Message text: WBS element & is not a billing element
WBS element &V1& is not defined as a <GL:billing_element>billing
element</>. This being the case, you cannot plan revenues in it.
Processing stopped.
Correct your input by entering a WBS element which is defined as a
billing element.
If you want to plan revenues in WBS element &V1&, the system
administrator or some other authorized person, such as the project
manager, must flag it as a billing element.
Action by system administrator
Flag WBS element &V1& as a billing element.
RESET N2
In the Project System, go to the "Operative Structures" menu
Choose Project struct -> Change.
Enter the project definition and press ENTER.
Choose Goto -> WBS element overview -> Operative indicators
Define the billing elements.
Error message extract from SAP system. Copyright SAP SE.
BP048
- WBS element & is not a billing element ?The SAP error message BP048 indicates that the Work Breakdown Structure (WBS) element you are trying to use is not set up as a billing element. This typically occurs in the context of project management and billing processes within SAP, particularly when dealing with project-related billing documents.
Cause:
- WBS Element Configuration: The WBS element may not be configured to allow billing. In SAP, not all WBS elements are set up to be billing elements. This can happen if the WBS element is not marked as a billing element in its configuration.
- Project Structure: The WBS element might be part of a project structure that does not allow billing, or it may be in a status that prevents billing.
- Missing Assignment: The WBS element may not be assigned to a billing-related project or may not have the necessary settings to allow billing.
Solution:
Check WBS Element Settings:
- Go to the WBS element in question using transaction code
CJ20N
(Project Builder) orCJ03
(Display WBS).- Verify the settings of the WBS element. Ensure that the "Billing Element" checkbox is selected in the WBS element's attributes.
Adjust Project Settings:
- If the WBS element is part of a project, check the overall project settings to ensure that billing is enabled for the project.
- Ensure that the project is in a status that allows billing (e.g., not in a closed status).
Consult with Configuration Team:
- If you do not have the necessary permissions to change the settings, consult with your SAP configuration team or project manager to ensure that the WBS element is correctly configured for billing.
Review Billing Documents:
- If you are trying to create a billing document, ensure that all necessary prerequisites are met, such as having the correct billing type and ensuring that all required data is filled out.
Related Information:
CJ20N
(Project Builder), CJ03
(Display WBS), and VF01
(Create Billing Document).By following these steps, you should be able to resolve the BP048 error and successfully process billing for the relevant WBS element.
Get instant SAP help. Start your 7-day free trial now.
BP047
There is already a parked document for this center and item
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BP046
Assign a budget profile to FM area &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BP049
Document & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...