Do you have any question about this error?
Message type: E = Error
Message class: BOS04 - BOS PS integration and Futher objects with EN language
Message number: 032
Message text: Cost estimate &1(&2) is transferred to project/subproject &3(&4)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BOS04032
- Cost estimate &1(&2) is transferred to project/subproject &3(&4) ?The SAP error message BOS04032 indicates that a cost estimate has been transferred to a project or subproject. This message typically arises in the context of project system (PS) or controlling (CO) modules when there is an issue with the cost estimate being processed or transferred.
Cause:
- Cost Estimate Status: The cost estimate may not be in a status that allows it to be transferred to the project or subproject. For example, it might be marked as "not released" or "not valid."
- Project Structure: The project or subproject may not be set up correctly, or it may not be in a state that allows for the acceptance of cost estimates.
- Configuration Issues: There may be configuration issues in the system that prevent the cost estimate from being properly linked to the project.
- Missing Authorizations: The user may lack the necessary authorizations to perform the transfer of the cost estimate to the project.
Solution:
- Check Cost Estimate Status: Verify the status of the cost estimate in the system. Ensure that it is released and valid for transfer.
- Review Project Structure: Ensure that the project or subproject is correctly set up and is in a state that allows for cost estimates to be transferred.
- Configuration Review: Check the configuration settings in the SAP system related to project costing and cost estimates. Ensure that all necessary settings are correctly configured.
- Authorization Check: Ensure that the user has the necessary authorizations to perform the transfer. This may involve checking user roles and permissions in the SAP system.
- Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message and its resolution.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
BOS04031
Set a priority for the cost transfer
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BOS04030
Cannot locate cost estimate for WBS element &; contact technical support
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BOS04033
Costing item &1(&2) is transferred to project/subproject &3(&4)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BOS04034
No default profile is set; select one profile as default
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.