Do you have any question about this error?
Message type: E = Error
Message class: BORRT - Messages for regular routes
Message number: 022
Message text: Schedule & created
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BORRT022
- Schedule & created ?The SAP error message BORRT022 typically relates to issues with scheduling in the SAP system, particularly in the context of production planning or project management. The message "Schedule & created" indicates that a scheduling operation has been performed, but there may be underlying issues that need to be addressed.
Cause:
- Data Inconsistencies: There may be inconsistencies in the data related to the scheduling, such as missing or incorrect master data (e.g., material master, routing, work center).
- Resource Availability: The resources required for the scheduled operation may not be available, leading to scheduling conflicts.
- Configuration Issues: Incorrect configuration settings in the scheduling parameters or planning strategies can lead to this error.
- Dependencies: There may be dependencies or constraints that are not met, such as predecessor tasks not being completed.
Solution:
- Check Master Data: Verify that all relevant master data (materials, routings, work centers) is correctly maintained and up to date.
- Review Scheduling Parameters: Check the scheduling parameters in the configuration settings to ensure they are set correctly for your planning needs.
- Resource Availability: Ensure that the necessary resources (machines, labor) are available and not overbooked or under maintenance.
- Analyze Dependencies: Review the dependencies and constraints in the scheduling process to ensure that all prerequisites are met.
- Error Logs: Check the system logs for any additional error messages or warnings that may provide more context about the issue.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the BORRT022 message.
Related Information:
CO02
(Change Production Order) or CJ20N
(Project Builder) to investigate the scheduling details.By following these steps, you should be able to identify the root cause of the BORRT022 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
BORRT021
Maintain route schedule determination conditions for vendor &
What causes this issue? The schedule determination is not maintained.System Response For the supplier from which the delivery comes from, maintain t...
BORRT020
Maintain the transport data
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BORRT023
Schedule & changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BORRT024
Select the materials that you want to copy
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.