Do you have any question about this error?
Message type: E = Error
Message class: BORGR - Messages Multi-Level Goods Receipt
Message number: 759
Message text: Link HUs and summarized JIT calls in item &1 first
Item &V1& contains both summarized JIT calls and handling units. Goods
receipt for partial quantities is only possible if these handling units
have been assigned to summarized JIT calls.
Goods receipt for partial quantities is not possible for these items.
Assign the handling units to summarized JIT calls.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
BORGR759
- Link HUs and summarized JIT calls in item &1 first ?The SAP error message BORGR759 typically occurs in the context of handling Handling Units (HUs) and Just-In-Time (JIT) calls in the logistics and supply chain modules of SAP. This error indicates that there is an issue with linking Handling Units (HUs) to JIT calls, specifically that the system requires you to link HUs before proceeding with the operation.
Cause:
The error message BORGR759 is triggered when:
- You are trying to process a JIT call that has associated Handling Units (HUs) that have not been linked or processed correctly.
- The system expects that all HUs related to the JIT call should be linked before any further actions can be taken.
- There may be a configuration issue or a missing step in the process that prevents the HUs from being linked properly.
Solution:
To resolve the BORGR759 error, you can follow these steps:
Link Handling Units:
- Navigate to the transaction or screen where you can manage Handling Units.
- Ensure that all HUs related to the JIT call are linked correctly. This may involve using transaction codes like
HU02
(Change Handling Unit) orHU03
(Display Handling Unit) to check the status of the HUs.Check JIT Call Status:
- Verify the status of the JIT call to ensure it is open and ready for processing.
- Use transaction codes like
JIT1
orJIT2
to view and manage JIT calls.Review Configuration:
- Check the configuration settings related to Handling Units and JIT processes in your SAP system. Ensure that all necessary settings are correctly configured.
Consult Documentation:
- Refer to SAP documentation or help files for specific instructions on handling HUs and JIT calls. This can provide insights into any additional steps that may be required.
Contact Support:
- If the issue persists after following the above steps, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
HU01
, HU02
, JIT1
, and JIT2
.By ensuring that all HUs are linked to the JIT calls as required, you should be able to resolve the BORGR759 error and continue with your logistics processes.
Get instant SAP help. Start your 7-day free trial now.
BORGR758
Material quantity in HUs (&1) larger than quantity in SumJC (&2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BORGR757
Material quantity in HUs (&1) smaller than quantity in SumJC (&2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BORGR760
In &1:Specified non-assigned qty &2 greater than max. non-assigned qty &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BORGR761
In &1 qty &2 (sel. objects + non-assign.qty) greater than postable qty &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.