How To Fix BK143 - Cost center &/activ. type & is not yet planned in version &/&


SAP Error Message - Details

  • Message type: E = Error

  • Message class: BK - Create, Display, Reverse Controlling Document

  • Message number: 143

  • Message text: Cost center &/activ. type & is not yet planned in version &/&

  • Show details Hide details
  • What causes this issue?

    Planning was not carried out for the given combination of cost center
    &V1&/activity type &V2& in fiscal year &V4& for version &V3&
    Because, in addition, no actual activity price indicator was determined
    for activity type &V2&, no actual allocation can be carried out for
    cost center &V1&/activity type &V2&.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    To allocate the activity type in actual, either
    carry out activity type planning for the given combination
    set the actual activity price indicator for activity type &V2& so that
    a follow-up valuation is carried out in actual
    Planning and maintenance of the activity price indicator is undertaken
    in CCA with the function "Activity type planning".

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message BK143 - Cost center &/activ. type & is not yet planned in version &/& ?

    The SAP error message BK143 indicates that a cost center and its associated activity type have not been planned in the specified version of the planning scenario. This error typically arises during the planning process in SAP Controlling (CO) when you attempt to execute a transaction that requires planning data that is not available.

    Cause:

    1. No Planning Data: The cost center and activity type combination has not been assigned any planned values in the specified version.
    2. Incorrect Version: The version you are trying to access may not have been set up correctly or may not be the one intended for planning.
    3. Missing Master Data: The cost center or activity type may not be properly defined or activated in the system.
    4. Planning Cycle: The planning cycle may not include the cost center or activity type in question.

    Solution:

    1. Check Planning Data:

      • Go to the planning transaction (e.g., KP06 for cost center planning) and check if the cost center and activity type have been planned for the specified version.
      • If not, enter the necessary planning data.
    2. Verify Version Settings:

      • Ensure that you are using the correct version for planning. You can check this in the planning layout or configuration settings.
      • If the version is incorrect, switch to the correct version or create a new version if necessary.
    3. Review Master Data:

      • Check if the cost center and activity type are correctly defined in the system. You can do this by navigating to the relevant master data transactions (e.g., KS01 for cost centers, KA01 for activity types).
      • Ensure that the cost center is active and assigned to the correct controlling area.
    4. Planning Cycle Configuration:

      • Review the planning cycle to ensure that the cost center and activity type are included in the planning process.
      • If they are not included, you may need to adjust the planning cycle settings.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for additional guidance on planning and error resolution.

    Related Information:

    • Transaction Codes: KP06 (Cost Center Planning), KP26 (Activity Type Planning), KS01 (Create Cost Center), KA01 (Create Activity Type).
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Authorization: Ensure that you have the necessary authorizations to access and modify planning data.

    By following these steps, you should be able to resolve the BK143 error and successfully plan for the specified cost center and activity type in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant