How To Fix BJ016 - Project & is allocated to standard WBS &.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: BJ - Standard WBS

  • Message number: 016

  • Message text: Project & is allocated to standard WBS &.

  • Show details Hide details
  • What causes this issue?

    Your project &V1& was created with the standard WBS &V2&.
    In this situation, you cannot assign a network to the project.

    System Response

    INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX

    How to fix this error?

    INCLUDE 'NA_ALLG_MOEGLICH' OBJECT DOKU ID TX
    RESET N1
    Using "possible entries" select a project that was created with this
    standard WBS and then select <PF>copy</>.
    Using <PF>Create project</> create a new project from the standard WBS.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message BJ016 - Project & is allocated to standard WBS &. ?

    The SAP error message BJ016 typically indicates that a project is allocated to a standard Work Breakdown Structure (WBS) element, but there is an issue with the allocation or configuration. This error can arise in various scenarios, such as when trying to assign costs, create a project, or perform other project-related activities.

    Cause:

    1. Incorrect WBS Element: The WBS element may not be correctly defined or may not allow the project to be allocated to it.
    2. Project Structure Issues: The project structure may not be properly set up, leading to conflicts with the standard WBS.
    3. Authorization Issues: The user may not have the necessary authorizations to perform actions related to the WBS or project.
    4. Configuration Settings: There may be configuration settings in the project system that prevent the allocation of the project to the WBS.

    Solution:

    1. Check WBS Element: Verify that the WBS element is correctly defined and is set up to accept project allocations. Ensure that it is not marked as "inactive" or "deleted."
    2. Review Project Structure: Ensure that the project structure is correctly configured and that the project is properly linked to the WBS element.
    3. Authorization Check: Confirm that the user has the necessary authorizations to work with the project and WBS elements. This may involve checking roles and permissions in the SAP system.
    4. Configuration Review: Review the configuration settings in the Project System (PS) module to ensure that they are set up correctly for the project and WBS elements.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message and its resolution.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CJ20N (Project Builder) or CJ01 (Create Work Breakdown Structure) to review and modify project and WBS settings.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error message or provide additional troubleshooting steps.
    • Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    By following these steps, you should be able to identify the cause of the BJ016 error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker