Message type: E = Error
Message class: BJ - Standard WBS
Message number: 016
Message text: Project & is allocated to standard WBS &.
Your project &V1& was created with the standard WBS &V2&.
In this situation, you cannot assign a network to the project.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
INCLUDE 'NA_ALLG_MOEGLICH' OBJECT DOKU ID TX
RESET N1
Using "possible entries" select a project that was created with this
standard WBS and then select <PF>copy</>.
Using <PF>Create project</> create a new project from the standard WBS.
Error message extract from SAP system. Copyright SAP SE.
BJ016
- Project & is allocated to standard WBS &. ?The SAP error message BJ016 typically indicates that a project is allocated to a standard Work Breakdown Structure (WBS) element, but there is an issue with the allocation or configuration. This error can arise in various scenarios, such as when trying to assign costs, create a project, or perform other project-related activities.
Cause: Incorrect WBS Element: The WBS element may not be correctly defined or may not allow the project to be allocated to it. Project Structure Issues: The project structure may not be properly set up, leading to conflicts with the standard WBS. Authorization Issues: The user may not have the necessary authorizations to perform actions related to the WBS or project. Configuration Settings: There may be configuration settings in the project system that prevent the allocation of the project to the WBS.
Solution: Check WBS Element: Verify that the WBS element is correctly defined and is set up to accept project allocations. Ensure that it
Get instant SAP help. Sign up for our Free Essentials Plan.
BJ011
Standard WBS & does not exist.
What causes this issue? Standard WBS "&V1&" does not exist.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ...
BJ010
Standard WBS & already exists.
What causes this issue? Standard WBS "&V1&" already exists.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ...
BJ017
Project & is not allocated to a standard WBS.
What causes this issue? Your project, &V1&, was not created from a standard project. You can only assign a network to a project when it also ...
BJ018
Another standard WBS is used for this material
What causes this issue? The material for this sales order has been assigned to project &v1& with the standard WBS &v2&. You have now ...