Message type: E = Error
Message class: BIL - General billing
Message number: 022
Message text: Distribution not possible due to zero consumption
You attempted to distribute consumption values or a quantity between the
primary installation and the distribution-relevant secondary
installations in an installation group. Distribution is to take place
according to consumption. This means the total consumption value must be
greater than zero. However, this is not the case in the period from &v1&
to &v2&.
The system cancels billing.
Check the meter reading results.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
BIL022
- Distribution not possible due to zero consumption ?The SAP error message BIL022, which states "Distribution not possible due to zero consumption," typically occurs in the context of billing and distribution processes within SAP, particularly in the SAP IS-U (Industry Solution for Utilities) module. This error indicates that there is an attempt to distribute costs or revenues, but the system has identified that there is no consumption data available for the relevant period or account.
Cause: No Consumption Data: The primary cause of this error is that there is no consumption data recorded for the billing period in question. This could be due to: No meter readings being taken. Meter readings being entered incorrectly or not at all. The consumption data being zero or not available for the relevant billing period. Incorrect Configuration: There may be configuration issues in the billing or distribution settings that prevent the system from recognizing valid consumption data. Timing Issues: The error may also arise if the billing process is
Get instant SAP help. Sign up for our Free Essentials Plan.
BIL021
Negative serial switching consumption in installation &1
What causes this issue? A negative serial switching consumption value was determined at installation &v1& in the period from &v2& to ...
BIL020
Input operand can only be provided by the secondary installation
What causes this issue? You are using a variant program in which an input operand can only be supplied with data as follows: The operand value comes ...
BIL023
Operand &1 from ERCHV contains overlapping values
What causes this issue? The periods in the ERCHV entries for operand &v1& overlap. This is not permitted since it does not make sense to add ...
BIL024
Device &1, register &2: Missing meter reading for transformer allocation
What causes this issue? Device &v1& and register &v2& are allocated to a power transformer ( <DS:DE.E_ZUART>device allocation t...
Click on this link to search all SAP messages.