How To Fix /BEV1/NE008 - Empties explosion failed; bill of material is not one-level


/BEV1/NE008 - Overview

  • Message type: E = Error

  • Message class: /BEV1/NE -

  • Message number: 008

  • Message text: Empties explosion failed; bill of material is not one-level

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /BEV1/NE008 - Empties explosion failed; bill of material is not one-level ?
    The SAP error message /BEV1/NE008 Empties explosion failed; bill of material is not one-level typically occurs in the context of handling bill of materials (BOM) in the SAP system, particularly when dealing with the management of returnable packaging or empties.
    
    Cause: This error indicates that the system attempted to explode a bill of materials (BOM) for a product, but the BOM is not structured as a one-level BOM. In other words, the BOM contains multiple levels of components or sub-components, which the system is not able to process in the context of the operation you are trying to perform.
    Solution: To resolve this error, you can consider the following steps: Check BOM Structure: Review the BOM for the material in question. Ensure that it is structured correctly and that you are using a one-level BOM if that is required for the operation you are performing. Use Appropriate Functionality: If your process requires a multi-level BOM, ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker