Do you have any question about this error?
Message type: E = Error
Message class: BC - Scheduler (calendar)
Message number: 430
Message text: Unnecessary start date, end date, or conflict handling specified
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BC430
- Unnecessary start date, end date, or conflict handling specified ?The SAP error message BC430 indicates that there is an issue with the date specifications in a particular transaction or configuration. This error typically arises when unnecessary date parameters are provided in a context where they are not required or when there is a conflict in the date handling.
Cause:
- Unnecessary Date Parameters: The error often occurs when you specify both a start date and an end date in a situation where only one is needed, or when the system does not require any date parameters at all.
- Conflict in Date Handling: If there are conflicting date settings in the configuration or transaction, the system may not be able to process the request correctly.
- Incorrect Configuration: The configuration settings in the relevant module may not align with the data being processed, leading to this error.
Solution:
- Review Date Inputs: Check the transaction or configuration where the error occurred. Ensure that you are not providing unnecessary start and end dates. If only one date is required, remove the other.
- Check for Conflicts: Look for any conflicting settings in the configuration that might be causing the issue. This could involve checking the settings in the relevant module (e.g., Project Management, Production Planning, etc.).
- Consult Documentation: Refer to the SAP documentation or help files related to the specific transaction or module you are working with. This can provide insights into the expected input parameters.
- Test with Minimal Input: If possible, try executing the transaction with minimal input to see if the error persists. This can help isolate the cause of the issue.
- Contact Support: If the issue cannot be resolved through the above steps, consider reaching out to your SAP support team or consulting with SAP support for further assistance.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the BC430 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
BC428
Invalid overflow
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BC427
Invalid time zone
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BC431
Invalid time description
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BC435
Incorrect day and month specified
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.