Do you have any question about this error?
Message type: E = Error
Message class: AY - Deprec. simulation - maint. module (AIPS) /gen. master data
Message number: 148
Message text: Also maintain the cost center for activity type &1
You entered activity type &V1& as origin object.
"Activity type" is not an origin object. Therefore, you also have to
enter the cost center where the activity was performed, in addition to
the activity type.
Enter the cost center that performed activity type &V1&, or
delete the activity type.
Error message extract from SAP system. Copyright SAP SE.
AY148
- Also maintain the cost center for activity type &1 ?The SAP error message AY148, which states "Also maintain the cost center for activity type &1," typically occurs when you are trying to create or modify an activity type in the SAP system, but the system cannot find a corresponding cost center for that activity type. This is often related to the configuration of cost centers and activity types in the Controlling (CO) module.
Cause:
- Missing Cost Center Assignment: The activity type you are trying to work with does not have a cost center assigned to it in the system.
- Configuration Issues: The configuration for the activity type may not be complete, or the necessary settings in the controlling area may not be properly maintained.
- Data Inconsistency: There may be inconsistencies in the master data related to cost centers or activity types.
Solution:
To resolve the AY148 error, you need to ensure that a cost center is assigned to the specified activity type. Here are the steps to do this:
Access the Activity Type Configuration:
- Go to the SAP Easy Access screen.
- Navigate to the following path:
Controlling
->Cost Center Accounting
->Master Data
->Activity Types
->Maintain Activity Types
.Select the Activity Type:
- Enter the controlling area and the activity type that is causing the error.
- Click on the "Display" or "Change" button.
Maintain Cost Center:
- In the activity type details, look for the section where you can assign a cost center.
- Ensure that a valid cost center is assigned to the activity type. If not, you will need to create or assign an existing cost center.
Save Changes: After making the necessary changes, save your entries.
Check Related Master Data: Ensure that the cost center itself is active and properly configured in the system.
Related Information:
KS01
(Create Cost Center), KS02
(Change Cost Center), and KSC1
(Create Activity Type) to manage cost centers and activity types.By following these steps, you should be able to resolve the AY148 error and successfully maintain the cost center for the specified activity type.
Get instant SAP help. Start your 7-day free trial now.
AY147
The total of origin &1 does not correspond to the APC &2
What causes this issue? The total of the origin data &V1& does not agree with the total of APC &V2&, accumulated depreciation and tra...
AY146
Simultaneous acct assignmnt to order and WBS element not possible
What causes this issue? You cannot enter a capital investment order and a WBS element at the same time.System Response The system issues an error me...
AY149
Cost center / activity type does not exist for &1 &2 in fiscal year &3
What causes this issue? As origin, you have entered cost center &V1& and activity type &V2& in fiscal year &V3&. The individ...
AY150
'&' is not allowed as first character in the asset main number
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.