Message type: E = Error
Message class: AY - Deprec. simulation - maint. module (AIPS) /gen. master data
Message number: 092
Message text: &2: There are too many AuCs
Object concerned: <ZH> &V2& </>.
There are two possible reasons for the error: either the indicator "AuC
per origin structure and origin assignment" is not set in investment
profile &V1& for the object; or there is no origin structure entered in
the object.
In both cases, there should only be exactly one asset under
construction for the object. However, several assets under
construction exist.
Processing is not continued.
You can delete the assets under construction for the object in online
(Change object: Extras --> Asset under construction).
Error message extract from SAP system. Copyright SAP SE.
AY092
- &2: There are too many AuCs ?The SAP error message AY092 with the description "There are too many AuCs" typically occurs when the system encounters a limit on the number of Asset Under Construction (AuC) objects that can be associated with a particular project or investment measure. This limit is often set to ensure system performance and manageability.
Cause:
- Exceeding System Limits: The error usually arises when the number of AuCs linked to a project exceeds the predefined limit set in the system configuration.
- Configuration Settings: The limit for AuCs can be defined in the system settings, and if your project has a large number of AuCs, it may surpass this limit.
- Data Management: Poor data management practices or a lack of proper archiving can lead to an accumulation of AuCs, triggering this error.
Solution:
- Review Configuration Settings: Check the configuration settings in the SAP system to determine the maximum number of AuCs allowed for a project. This can typically be found in the Asset Accounting (FI-AA) configuration.
- Reduce AuCs: If possible, consolidate or reduce the number of AuCs associated with the project. This may involve:
- Merging similar AuCs.
- Completing or capitalizing AuCs that are no longer needed.
- Deleting AuCs that are not required.
- Increase Limits: If the business process requires a higher number of AuCs, consider discussing with your SAP Basis or configuration team about increasing the limit in the system settings.
- Data Archiving: Implement data archiving strategies to manage the number of AuCs effectively. This can help in keeping the system performance optimal and within limits.
- Consult Documentation: Refer to SAP documentation or notes related to Asset Accounting for any specific guidelines or recommendations regarding AuC limits.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
AY091
&2: There are too many AuCs, deletion is not possible
What causes this issue? Object concerned: <ZH> &V2& </>. The object is a capital investment measure, but no origin structure has ...
AY090
Sample order &1 blocked by &2 - no maintainance possible.
What causes this issue? You want to assign the investment profile or the capitalization key to sample order &V1&. Sample order &V1& ...
AY093
&2: There are too many AuCs
What causes this issue? Object concerned: <ZH> &V2& </>. There are two possible reasons for the error: either the indicator &quo...
AY094
&4: AuC has no valid origin assignment, deletion is not possible
What causes this issue? Object concerned: <ZH> &V4& </> An asset under construction exists for this object, investment profile &a...
Click on this link to search all SAP messages.