Do you have any question about this error?
Message type: E = Error
Message class: AUR - Unbilled Revenue Reporting and Mass Simulation
Message number: 037
Message text: Plan version &1 is not valid
Plan version &V1& that you entered for identification of simulation
period &V2& is not permissible for one of the following reasons:
You have not yet entered a plan version, although an update must take
place in <LS>Profitability Analysis</> (CO-PA).
The plan version does not exist.
You have entered version 0 (actual data). The data for the mass
simulation can never be updated in the version for actual data.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
INCLUDE ISU_KORR OBJECT DOKU ID TX
Error message extract from SAP system. Copyright SAP SE.
AUR037
- Plan version &1 is not valid ?The SAP error message AUR037, which states "Plan version &1 is not valid," typically occurs in the context of planning and budgeting processes within SAP, particularly in modules like SAP Controlling (CO) or SAP Integrated Business Planning (IBP). This error indicates that the specified plan version (denoted by &1) is not recognized or is not valid for the operation you are trying to perform.
Causes:
- Non-existent Plan Version: The plan version you are trying to use does not exist in the system.
- Inactive Plan Version: The plan version exists but is not active or has been marked for deletion.
- Authorization Issues: The user may not have the necessary authorizations to access the specified plan version.
- Incorrect Configuration: The plan version may not be properly configured in the system settings.
- Data Consistency Issues: There may be inconsistencies in the data that prevent the plan version from being recognized.
Solutions:
- Check Plan Version: Verify that the plan version you are trying to use actually exists in the system. You can do this by navigating to the relevant planning transaction or configuration area.
- Activate Plan Version: If the plan version exists but is inactive, you may need to activate it. This can usually be done in the planning version configuration settings.
- Review Authorizations: Ensure that the user has the necessary authorizations to access the plan version. This may involve checking user roles and permissions in the SAP system.
- Configuration Review: Check the configuration settings for the planning version to ensure that it is set up correctly. This may involve consulting with a system administrator or SAP consultant.
- Data Consistency Check: Run any necessary data consistency checks or reports to identify and resolve any underlying data issues that may be causing the error.
Related Information:
KP06
(for planning) or KP01
(for creating plan versions) to manage plan versions.By following these steps, you should be able to identify the cause of the AUR037 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
AUR036
Simulation period &1 is inconsistent
What causes this issue? The simulation periods from &V2& to &V3& for the <DS:DE.SIMRUNID>identification of the simulation perio...
AUR035
The specified UIS version number &1 does not begin with B
What causes this issue? The <DS:DE.MCVERSION_BI>version number</> of the <DS:DE.MCINF_BI>information structure</> (Utiliites ...
AUR038
Transaction category &1 is not valid for update to CO-PA
What causes this issue? The <DS:DE.RKE_VRGAR>record type</> for the update to <LS>Profitability Analysis</> (CO-PA) has value...
AUR039
Changes to status can lead to inconsistencies
What causes this issue? Up until now the <DS:DE.SIMRUNID>simulation period ID</> &V1& had one of the following statuses: <LS&g...
Click on this link to search all SAP messages.