Do you have any question about this error?
Message type: E = Error
Message class: AUR - Unbilled Revenue Reporting and Mass Simulation
Message number: 036
Message text: Simulation period &1 is inconsistent
The simulation periods from &V2& to &V3& for the
<DS:DE.SIMRUNID>identification of the simulation period</> &V1& is
inconsistent for one of the following reasons:
The simulation period does not begin on the first day of a month.
The simulation period does not end on the last day of a month.
The start of the simulation period is not before the end of the
simulation period.
You cannot use this simulation period.
Correct the start date and end date of the simulation period.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
AUR036
- Simulation period &1 is inconsistent ?The SAP error message AUR036, which states "Simulation period &1 is inconsistent," typically occurs in the context of SAP's Advanced Planning and Optimization (APO) module or similar planning scenarios. This error indicates that there is an inconsistency in the simulation period defined in your planning settings.
Cause:
- Incorrect Configuration: The simulation period may not be properly defined in the planning settings, leading to inconsistencies.
- Date Range Issues: The start and end dates of the simulation period may not align with the planning calendar or may fall outside the valid range.
- Master Data Issues: There may be missing or incorrect master data (like product, location, or planning version) that affects the simulation period.
- Planning Version: The planning version being used may not be set up correctly for the simulation period.
- Data Locking: If the data is locked for the specified period, it may lead to inconsistencies.
Solution:
- Check Configuration: Review the configuration settings for the simulation period in the relevant planning area. Ensure that the start and end dates are correctly defined.
- Validate Date Ranges: Ensure that the simulation period falls within the valid planning calendar. Adjust the dates if necessary.
- Review Master Data: Check the master data related to the products and locations involved in the simulation. Ensure that all necessary data is complete and accurate.
- Planning Version Settings: Verify that the planning version you are using is correctly set up for the simulation. You may need to create or adjust the planning version.
- Unlock Data: If the data is locked, you may need to unlock it or adjust the locking settings to allow for the simulation to proceed.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to your version of SAP and the APO module.
Related Information:
/SAPAPO/SDP94
(for planning book) or /SAPAPO/MC62
(for planning version) to check and adjust settings.By following these steps, you should be able to identify and resolve the inconsistency causing the AUR036 error message.
Get instant SAP help. Start your 7-day free trial now.
AUR035
The specified UIS version number &1 does not begin with B
What causes this issue? The <DS:DE.MCVERSION_BI>version number</> of the <DS:DE.MCINF_BI>information structure</> (Utiliites ...
AUR034
Termination during document transfer to the customer-specific statistics
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
AUR037
Plan version &1 is not valid
What causes this issue? Plan version &V1& that you entered for identification of simulation period &V2& is not permissible for one of...
AUR038
Transaction category &1 is not valid for update to CO-PA
What causes this issue? The <DS:DE.RKE_VRGAR>record type</> for the update to <LS>Profitability Analysis</> (CO-PA) has value...
Click on this link to search all SAP messages.