Do you have any question about this error?
Message type: E = Error
Message class: AO_PLANNING - Message Class for Project WGRS-4B4R6S
Message number: 001
Message text: Changing the responsible company code no longer allowed
Planning already took place on a least one variant of the appropriation
request.
Changing the responsible company code is not allowed.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
AO_PLANNING001
- Changing the responsible company code no longer allowed ?The SAP error message AO_PLANNING001 ("Changing the responsible company code no longer allowed") typically occurs in the context of Asset Accounting (FI-AA) or when dealing with planning and budgeting in SAP. This error indicates that the system does not allow changes to the responsible company code for a particular asset or planning object after certain conditions have been met.
Cause:
- Status of the Asset: The asset may have been fully capitalized or may have transactions that have already been posted against it, which locks the company code.
- Period Closing: If the financial periods are closed, changes to the company code are restricted.
- Configuration Settings: Certain configuration settings in the system may prevent changes to the responsible company code once it has been set.
- Data Consistency: SAP enforces data consistency rules, and changing the company code could lead to inconsistencies in financial reporting.
Solution:
- Check Asset Status: Verify the status of the asset. If it has been fully capitalized or has transactions, you may need to create a new asset under the desired company code instead of changing the existing one.
- Open Periods: Ensure that the financial periods are open for posting. If they are closed, you may need to reopen them (if permissible) or wait until the next period.
- Configuration Review: Review the configuration settings in the Asset Accounting module to understand if there are restrictions in place regarding changes to the company code.
- Consult Documentation: Refer to SAP documentation or consult with your SAP support team for specific guidelines on handling this error.
- Create a New Asset: If changing the company code is not possible, consider creating a new asset in the desired company code and transferring the relevant data.
Related Information:
By following these steps, you should be able to address the AO_PLANNING001 error effectively.
Get instant SAP help. Start your 7-day free trial now.
AO_PLANNING000
>>> WGRS-4B4R6S >>> Messages >>> WGRS-4B4R6S >>>
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
AO_MPO552
Planning is locked on variant &1 - changing plan values not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
AO_PLANNING002
Changing the object currency no longer allowed
What causes this issue? Planning already took place on a least one variant of the appropriation request.System Response Changing the object currency...
AO_PLANNING003
Changing the responsible company code no longer allowed
What causes this issue? A measure was already assigned to the the appropriation request.System Response Changing the responsible company code is no ...
Click on this link to search all SAP messages.