Do you have any question about this error?
Message type: E = Error
Message class: AO - Appropriation requests - Master data / Customizing
Message number: 018
Message text: Co. code currency &1 was adopted, since differnt CO area currency allowed
In controlling area &V2&, the company code currency is allowed to
differ from the controlling area currency. Therefore, the appropriation
request currency (object currency) always has to be the same as the
company code currency.
However, this is not the case.
&NOTE&
At the present time, it is not possible to plan on the appropriation
request in object currency. However, it is possible on the measures
(WBS element or order) that are created from the appropriation request.
The system automatically adopts company code currency &V1& as the
object currency of the appropriation request.
Check if the adoption of company code currency &V1& is correct. Also
check the company code you entered.
Error message extract from SAP system. Copyright SAP SE.
AO018
- Co. code currency &1 was adopted, since differnt CO area currency allowed ?The SAP error message AO018 indicates that there is a discrepancy between the currency settings of the company code and the controlling area. Specifically, it suggests that the company code currency has been adopted, but the controlling area allows for different currencies. This can lead to issues when trying to post transactions or perform reporting, as the system expects consistency in currency usage.
Cause:
- Currency Configuration Mismatch: The company code is set up with a specific currency, but the controlling area is configured to allow multiple currencies or a different currency.
- Transaction Posting: When attempting to post a transaction, the system detects that the currency of the company code does not match the expected currency settings of the controlling area.
- Master Data Issues: The master data for either the company code or the controlling area may not be aligned in terms of currency settings.
Solution:
Check Currency Settings:
- Go to the configuration settings for both the company code and the controlling area.
- Ensure that the currency settings are consistent. If the controlling area allows multiple currencies, ensure that the company code currency is one of the allowed currencies.
Adjust Controlling Area Settings:
- If necessary, you can change the controlling area settings to match the company code currency. This can be done in the configuration settings under the controlling area definition.
Review Master Data:
- Check the master data for any inconsistencies. Ensure that all relevant master records (e.g., cost centers, internal orders) are set up with the correct currency.
Consult Documentation:
- Refer to SAP documentation or help resources for detailed steps on how to configure currencies in the controlling area and company code.
Testing:
- After making changes, perform test transactions to ensure that the error does not reoccur.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP Basis or functional team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
AO017
Controlling area currency &1 was adopted
What causes this issue? The system adopted controlling area currency &V1& as the object currency.System Response The system issues an error ...
AO016
Company code currency &1 was adopted
What causes this issue? The system adopted company code currency &V1& as the object currency.System Response The system issues an error mess...
AO019
Distribution percentage rate &1 is larger than 100 - please correct
What causes this issue? You entered a distribution percentage rate of &V1& for the assignment to cost centers or profit centers. However, one...
AO020
Distribution percentage rate &1 is not allowed - please correct
What causes this issue? Either you did not enter a distribution percentage rate, or you entered a distribution percentage rate of 0% for the percenta...
Click on this link to search all SAP messages.