Do you have any question about this error?
Message type: E = Error
Message class: AJ - Billing program
Message number: 468
Message text: The selection was limited to the maximum permitted amount
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
AJ468
- The selection was limited to the maximum permitted amount ?The SAP error message AJ468, "The selection was limited to the maximum permitted amount," typically occurs in the context of financial transactions, particularly when dealing with budgetary controls or allocations in SAP. This error indicates that the system has restricted the amount that can be selected or processed due to predefined limits.
Cause:
- Budget Limits: The error often arises when a transaction exceeds the budgetary limits set for a particular cost center, internal order, or project.
- Configuration Settings: There may be configuration settings in the system that define maximum allowable amounts for certain transactions.
- User Authorizations: The user may not have the necessary authorizations to process amounts beyond a certain limit.
- Document Type Restrictions: Certain document types may have restrictions on the maximum amount that can be processed.
Solution:
- Check Budget Availability: Review the budget for the relevant cost center or internal order to ensure that there are sufficient funds available for the transaction.
- Adjust Configuration: If you have the necessary permissions, you may need to adjust the configuration settings in the system to allow for higher limits.
- User Authorizations: Ensure that the user has the appropriate authorizations to process the transaction. This may involve working with your SAP security team.
- Review Document Types: Check if the document type being used has any restrictions and consider using a different document type if applicable.
- Consult with Finance Team: If the issue persists, consult with your finance or controlling team to understand the specific limits and policies in place.
Related Information:
FMAVCR01
(for budget availability control) or KSB1
(for cost center reports) to analyze budget consumption.If the problem continues after checking these areas, it may be necessary to engage with SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
AJ467
Maintain facts for RTP operands at rate level
What causes this issue? You have tried to create facts for operand &v1&. However, facts can only be defined for RTP operands at rate fact lev...
AJ466
Specify a rate type for billing unit of measure &1
What causes this issue? The rate type you specified leads to rate &v2&. The unit of measurement for billing &V3& is defined for the r...
AJ469
The last value does not match the one in the &1 calorific value procedure
What causes this issue? Volume correction factor procedure &v3& is used in gas procedure &v2&. The <LS>Last value</> fiel...
AJ470
There is no executable schema step
What causes this issue? No executable schema step is available for billing. This error can occur when you have defined <DS:DE.OPTIONAL>optional...
Click on this link to search all SAP messages.