Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: AJ - Billing program
Message number: 099
Message text: No valid budget billing period has been determined
A new budget billing plan is to be created for periodic billing. In
this process, an extrapolation is performed for the budget billing
period. &v1& -- &v2& has been determined as the budget billing period,
but this period is invalid. The end (&v2&) of the budget billing period
was determined from the schedule records for meter reading unit &v3&.
Check the schedule records of meter reading unit &v3& for consistency,
and change them if necessary. When doing this, also check the schedule
records of the allocated portion &v4&.
Error message extract from SAP system. Copyright SAP SE.
AJ099
- No valid budget billing period has been determined ?The SAP error message AJ099, which states "No valid budget billing period has been determined," typically occurs in the context of budget billing processes within SAP, particularly in the SAP IS-U (Industry Solution for Utilities) module. This error indicates that the system is unable to find a valid budget billing period for the specified account or contract.
Causes:
- Missing Budget Billing Plan: The account or contract may not have an associated budget billing plan.
- Incorrect Configuration: The configuration settings for budget billing may not be set up correctly in the system.
- Inactive Budget Billing Period: The budget billing period may be inactive or not defined for the relevant time frame.
- Data Entry Errors: There may be errors in the data entry for the budget billing plan or related master data.
- Contract Status: The contract or account may be in a status that does not allow for budget billing.
Solutions:
- Check Budget Billing Plan: Verify that a valid budget billing plan is assigned to the account or contract. If not, create or assign a budget billing plan.
- Review Configuration: Ensure that the configuration for budget billing is correctly set up in the system. This includes checking the settings in the Customizing (SPRO) for budget billing.
- Activate Budget Billing Period: If the budget billing period is inactive, activate it or create a new budget billing period that covers the required dates.
- Correct Data Entry: Review the master data and ensure that all relevant fields are correctly filled out and that there are no inconsistencies.
- Check Contract Status: Ensure that the contract or account is in a status that allows for budget billing. If necessary, change the status to allow for budget billing processing.
Related Information:
EA00
(for budget billing plan maintenance) or EABP
(for budget billing plan overview) to manage budget billing plans.By following these steps, you should be able to identify the cause of the AJ099 error and implement the necessary solutions to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
AJ098
Billing document &1 for contract &2 has been outsorted
What causes this issue? Document &v1& from contract &v2& has been outsorted because it has not met the requirements of the outsorting...
AJ097
Unexpected termination in variant &1 in schema &2
What causes this issue? An error has occurred during execution of a variant. Further processing is not possible; billing of the contract is therefore...
AJ100
Operand &1 is season-based, but no season has been defined
What causes this issue? When operand &v1& was defined using Transaction EA51, the indicator for season demand was set. However, no season was...
AJ101
The number of demand peaks for operand &1 is zero
What causes this issue? During preprocessing of demand, the system has determined that no demand peaks have been defined for operand &v1& in ...
Click on this link to search all SAP messages.