Do you have any question about this error?
Message type: E = Error
Message class: AJ - Billing program
Message number: 075
Message text: The length of the period-end billing period has changed
The length of the period-end billing period was changed in the current
period-end billing period from &v3& to &v4&. The current length of the
period-end billing period was determined from rate category &v1&. The
period-end billing period starts on &v2&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
AJ075
- The length of the period-end billing period has changed ?The SAP error message AJ075, which states "The length of the period-end billing period has changed," typically occurs in the context of billing and revenue recognition processes, particularly when dealing with contracts or agreements that have specific billing periods.
Cause:
This error usually arises due to one of the following reasons:
- Change in Billing Period: The billing period for a contract or project has been modified, which can happen if the billing frequency or duration is altered.
- Configuration Changes: Changes in the configuration settings related to billing periods or billing types in the SAP system.
- Data Inconsistencies: Inconsistencies in the data related to billing periods, such as mismatched dates or periods that do not align with the expected billing cycle.
- Contract Modifications: If a contract has been modified (e.g., extended or shortened), it may lead to discrepancies in the expected billing periods.
Solution:
To resolve the AJ075 error, you can take the following steps:
- Review Contract Details: Check the contract or project details to ensure that the billing periods are correctly defined and consistent with the expected billing cycle.
- Check Configuration Settings: Verify the configuration settings for billing periods in the SAP system. Ensure that any changes made to billing frequency or duration are correctly reflected in the system.
- Adjust Billing Periods: If the billing period has changed, you may need to adjust the billing periods in the relevant contracts or projects to align with the new settings.
- Reprocess Billing: After making the necessary adjustments, attempt to reprocess the billing document or transaction that triggered the error.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling billing period changes and related configurations.
- Seek Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
VF01
(Create Billing Document), VF02
(Change Billing Document), and VF03
(Display Billing Document) to manage billing processes.By following these steps, you should be able to identify the root cause of the AJ075 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
AJ074
The length of the backbilling period has changed
What causes this issue? The length of the backbilling period was changed in the current backbilling period from &v3& to &v4&. The cur...
AJ073
The type of period-end billing was changed
What causes this issue? The type of period-end billing has been changed in the current period-end billing period. The type of period-end billing curr...
AJ076
Operand &1 has invalid value &2
What causes this issue? During execution of a variant, a value was found for the specified operand that is not permitted.System Response The system ...
AJ077
Period-end bill. order w. sched. billing date &2 created for contract &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.